Similar Projects
Golf Course Pavilion - City of Hutchinson
Infrastructure
Conception
$350,000 CJ est. value
Hutchinson, KS 67501

Bridge Replacement 6th Ave over ESD - City of Hutchinson
Demolition, New Construction, Infrastructure
Conception
$850,000 CJ est. value
Hutchinson, KS 67501

Rebuild Reconfigure 2nd / Walnut Parking Lot - City of Hutchinson
Infrastructure
Design
$300,000 CJ est. value
Hutchinson, KS 67501

3rd Ave (Pershing to Lorraine St) - City of Hutchinson
Infrastructure
Design
$2,750,000 CJ est. value
Hutchinson, KS 67501

Construction of Orchard Park Event Center at Orchard Park
New Construction, Infrastructure - 4,200 SF
Post-Bid
$1,317,309 CJ est. value
Hutchinson, KS 67502

Kisiwa Village Sanitary Sewermain Repair
Infrastructure
Post-Bid
$50,000 CJ est. value
Hutchinson, KS 67501

CCLIP Resurfacing K61 from US50 to 17th Avenue
Infrastructure
Results
$1,211,209 CJ est. value
Hutchinson, KS 67501

Grading and Bridge
Infrastructure
Results
$970,188 CJ est. value
Willowbrook, KS 67502

Woodie Seat Improvements Corridor Study
Infrastructure
Pending Verification
$2,500,000 CJ est. value
Hutchinson, KS 67501

Firehouse - City of Hutchinson
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Hutchinson, KS 67501

Halstead Street Reconstruct (Avenue G to 4th Road) - City of Hutchinson
Infrastructure
Conception
$4,700,000 CJ est. value
Hutchinson, KS 67502

Replace Well 15 - City of Hutchinson
Renovation
Design
$375,000 CJ est. value
Hutchinson, KS 67501

Kansas State Fair House Of Capper Reconstruction BLDG NO.: 37300-00044
Demolition, New Construction, Infrastructure
Post-Bid
$400,000 CJ est. value
Hutchinson, KS 67501

Memorial Hall - City of Hutchinson
Demolition, New Construction, Infrastructure
Pending Verification
$300,000 CJ est. value
Hutchinson, KS 67501

Waldron Street Reconstruct (17th to North Wldron) - City of Hutchinson
Infrastructure
Conception
$994,000 CJ est. value
Hutchinson, KS 67502

Last Updated 12/06/2022 04:04 PM
Project Title

Lift Station Improvements - City of Hutchinson

Physical Address View project details and contacts
City, State (County) Hutchinson, KS 67501   (Reno County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $2,750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope has not yet been determined. This project is in included in the city’s FY 2022-2026 Capital Improvement Plan (CIP). As of December 6, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents