Similar Projects
Skiff Point
New Construction
Design
Clearwater, FL 33767

Grady Brown Park Phase III Improvements
Renovation
Bidding
Freeport, FL 32439

Design-Build-Finance Services for North Bulkhead Berths 1-6 Realignment
Infrastructure
Bidding
$300,000,000 est. value
FL

Longwood/Poquito Bayou Park Dock Extension
Post-Bid
Shalimar, FL 32579

Macdill AFB Marina Wet Slip Repair
Post-Bid
Macdill AFB, FL

Rebuild UPH STA Ponce de Leon Inlet, New Smyrna Beach, FL
Results
$100,000 to $6,000,000 est. value
New Smyrna Beach, FL 32168

Buoy Maintenance Agreement
Term Contract
Results
Tallahassee, FL 32301

Lee County Boat Ramp Repair
Infrastructure
Bidding
Fort Myers, FL 33905

Repairs to East Side of Pier Railing
Post-Bid
Deerfield Beach, FL 33441

Lake Echo Dock
Results
Lake Alfred, FL 33850

Design-Build Floating Day Dock and Dinghy Dock
Post-Bid
Bradenton Beach, FL 34217

Lafayette Boardwalk Improvements
Results
Less than $190,085 est. value
De Funiak Springs, FL 32433

Martin County Bs/Mpz Marker Construction Project
Post-Bid
Jensen Beach, Stuart, FL

Williams Fishing Pier Rehabilitation
Results
$447,155 est. value
Gulfport, FL 33707

Depot Facility Bulkhead Repairs
Post-Bid
$1,000,000 to $2,000,000 est. value
Jacksonville, FL

Last Updated 11/19/2021 09:22 AM
Project Title

Eden Park Dock and Sidewalk Reconstruction

Physical Address View project details and contacts
City, State (County) Inverness, FL 34450   (Citrus County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $40,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of new 6' wide by 24' long fixed dock with side railings on new supports, pitch and level end platform to meet ADA compliance. Installation of 5' wide by 12' long hinged aluminum ramp way with side railings. Construction of 8' wide by 24' long aluminum framed floating dock with 4 galvanized pipe guides and pvc sleeves, dock perimeter will have bumpers on 3 sides, 6 tie cleats and four inner roller guides for pipe guides. All decking will be composite material with stainless steel hardware. Construction of new sidewalk using existing footprint to a width of 5' to meet ADA compliance. Removal and disposal of existing sidewalk, fixed dock, ramp way, floating dock, and supports.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 35 - Waterway and Marine Construction, Marine Specialties, Mooring Devices, Laser Docking Systems.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents