Similar Projects
Fort Madison 7-12 and PK-6 - Additions and Renovations - Rebid
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$25,723,839 CJ est. value
Fort Madison, IA 52627

Community Health Centers of Southeastern Iowa Clinic Addition Project
Addition, Demolition, Infrastructure - 17,486 SF
Post-Bid
$200,000 CJ est. value
Keokuk, IA 52632

Hma Resurfacing Cold in-Place Recycling
Infrastructure
Results
IA

Microsurfacing - U.S. 61
Infrastructure
Results
IA

Marina Improvements - Floating Docks
Infrastructure
Post-Bid
$1,200,000 CJ est. value
Fort Madison, IA 52627

PCC Pavement - Grade and New
Infrastructure
Results
IA

Marina Improvements - Fuel System
Infrastructure
Post-Bid
$105,000 CJ est. value
Fort Madison, IA 52627

PCC Pavement - Grade and Replace
Infrastructure
Results
Fort Madison, IA

Fort Madison 7-12 and Fort Madison Pk-6 Additions and Renovations - Bid Packages 9A and 9B
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$400,000 CJ est. value
Fort Madison, IA 52627

PCC Patching
Infrastructure
Results

Fort Madison 7-12 & PK-6 - Additions and Renovations Bid Package 9A Re-Bid
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$500,000 CJ est. value
Fort Madison, IA 52627

Granular Surfacing of Roadway
Infrastructure
Results

Donnellson Maintenance Garage Sewer Repair
Infrastructure
Post-Bid
$600,000 CJ est. value
Donnellson, IA 52625

2022 Street Sealcoat Project
Infrastructure
Results
$320,000 est. value
Fort Madison, IA

Road Maintenance - Shimek State Forest
Infrastructure
Results
$96,000 est. value
West Point, IA

Last Updated 12/30/2022 08:35 AM
Project Title

Earth or Granular Surface Trail

Physical Address View project details and contacts
City, State (County) Houghton, IA 52631   (Lee County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $206,512 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project Id : 221115 G1 County : Lee Projects Included: TAP-R-3562(601)--8T-56 ROUTE: LOOP TRAIL In the city of Houghton, Loop trail starting and ending at Bentler Street and south city limits, 1.2 miles in length DBE Goal: 1.0% Working Days : 45 Estimated Value :$125,000 - $250,000 Unless otherwise specified, a bidder shall submit a proposal as per Article 1102.09 of the Standard Specifications. Proposals received after the bid deadline will not be read. Proposals containing any reservations not provided for in the forms furnished will be rejected. The Iowa DOT reserves the right to waive technicalities and reject any or all bids. Unless otherwise specified, a bidder must submit a proposal guaranty/bid bond with each bid as per Article 1102.11 of the Standard Specifications. Failure to execute a contract and file an acceptable performance bond and certificate of insurance within 30 days of the approval date for awarding the contract will be just and sufficient cause for the denial of the award and forfeiture of the proposal guaranty. The Iowa DOT (or other approved contracting authority) hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Minimum wage rates for all federal-aid projects have been predetermined by the U.S. Secretary of Labor and are set forth in the specifications. However, this does not apply to projects off the federal-aid highway system. All federal-aid projects are subject to the Contract Work Hours Standards Act, as amended (title I of Pub. L. 87-581, Aug. 13, 1962, 75 Stat.357) and implementing regulations. IADOT - 302- Earth or Granular Surface Trail *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents