Similar Projects
Pump Station Construction
New Construction
Design
$1,500,000 est. value
Middletown, OH

East Sparta Lift Station Replacement
Renovation
Bidding
$998,015 est. value
OH

Engle Pump Station Renovations
Renovation
Bidding
$300,000 est. value
Cleveland, OH

Small Pump Station Improvements
Post-Bid
Less than $800,000 est. value
Miamisburg, OH

Portsmouth Local Protection Project
Post-Bid
$10,000,000 est. value
Portsmouth, OH

Blue Fountain Lift Station Pump Replacement
Results
Gallipolis, OH 45631

Pump Station Replacement for Mumaugh Road and Cable Road
Results
Lima, OH

2020 Water Treatment Plant
New Construction - 38,800 SF
Construction
$40,570,000 est. value
Marysville, OH

Booster Station Replacement - Portersville East Branch Water
Construction
$270,000 est. value
Malta, OH 43758

Replace and Construct Type III Hydrant Fuel System
New Construction, Demolition
Post-Bid
$10,000,000 to $25,000,000 est. value
Wright Patterson Air Force Base, OH

7th Street Sanitary Sewer Pump Station and Forcemain Project
Results
Waverly, OH

Industrial Corridor Pump Station and Force Main
New Construction
Construction
Ironton, OH 45638

Replacement of Switch Gear to Flood Water Pump Station #6
Post-Bid
Ironton, OH

Locust Lake Lift Station and Conveyance Improvements
Results
Less than $1,760,000 est. value
Batavia, OH 45103

Motor and Pump Repair/ Rebuilding
Post-Bid
Findlay, OH

Last Updated 05/05/2022 06:24 AM
Project Title

North Summit Supply Main Booster Station Replacement

Physical Address View project details and contacts
City, State (County) Akron, OH   (Summit County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves installation of 260 linear feet of new 12-inch diameter ductile iron water main, packaged booster station, electrical feed installation, SCADA integration, valving and appurtenances, demolition of an existing temporary booster station, abandonment of the existing suction and discharge piping of the existing booster station and site restoration following the installation of the North Summit Supply Main Booster Station.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents