Similar Projects
MDOC Lakeland Correctional Facility - HVAC Systems Upgrade
Renovation
Results
$8,891,214 CJ est. value
Coldwater, MI 49036

Chippewa Correctional Facility - Egress Ramps and Related Infrastructure
Renovation
Bidding
$531,000 CJ est. value
Sault Sainte Marie, MI 49784

RFP Design - Michigan Reformatory - Building Demolitions
Demolition, Infrastructure
Post-Bid
$190,000 CJ est. value
Ionia, MI 48846

Housing Unit A Medical Wing Upgrades
Renovation
Results
$763,000 CJ est. value
Ionia, MI 48846

McCoy Gun Range Improvements
Demolition, Renovation, Infrastructure
Results
$912,900 CJ est. value
Jackson, MI 49201

Food Service Flooring and Shower Upgrades - Parnall Correctional Facility
Renovation
Post-Bid
$370,000 CJ est. value
Jackson, MI 49201

Video Management System Upgrade - Phase 1
Renovation
Results
$3,013,620 CJ est. value
Jackson, MI 49201

Kent County Correctional - Cell Door Replacement B3 D2 D3
Renovation, Alteration
Results
Grand Rapids, MI

Thumb Corrections Gun Range Facility
Renovation
Bidding
$156,000 CJ est. value
Lapeer, MI 48446

RFP Design - Women's Huron Valley Correctional Facility (WHVCF) Power Plant Building - Phase 1 Boiler Replacements
Renovation
Post-Bid
$215,000 CJ est. value
Ypsilanti, MI 48197

Last Updated 02/06/2023 04:05 PM
Project Title

Charles E. Egeler Reception and Guidance Center Various Safety Improvements

Physical Address View project details and contacts
City, State (County) Jackson, MI 49201   (Jackson County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $2,790,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Work, Egeler Reception and Guidance Center - Various Safety Improvements, Agency No. 472, File No. 472/19523.RWG includes, but is not necessarily limited to Removing the existing pipe railings throughout 1 Block, 2 Block, and 3 Block Housing Units and replacing them with a new pipe railing system. This project will be phased into 6 parts. Each part will involve renovations in one half of the building. 5% Bid Security: ALL questions should be emailed to Richard Mann at rmann@straubpettittyaste.com no later than 2:00 p.m., Eastern on Thursday, December 29, 2022.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents