Similar Projects
Sanitary Sewer Installation and Repair
Term Contract
Post-Bid
Less than $275,000 est. value
Arlington, VA 22201

Contract for Miscellaneous Parts and Fittings
Post-Bid
Roanoke, VA 24012

Installation & Maintenance of Sanitary Sewer
Results
Less than $275,000 est. value
Arlington, VA 22201

Annual Services Contract 6 for Taps and Laterals Installation
Results
Virginia Beach, VA

NIT South Berth Manhole Lid Replacement
Post-Bid
Norfolk, VA

Maintain Portable Sanitary Facilities and Pump and Haul Services
Term Contract
Results
Stafford, VA

On-Call Construction of Storm, Sanitary, Water Mains Improvement
Post-Bid
Arlington, VA 22201

Kennedy Street Sewer Replacement Project
Results
Roanoke, VA

Pump & Clean Grease Traps
Post-Bid
Virginia Beach, VA 23464

Manhole Rehabilitation
Term Contract
Results
Front Royal, VA

Grease Trap Cleaning
Term Contract
Post-Bid
Charlottesville, VA

Rosedale Sanitary Sewer Replacement Project
Results
VA

Septic Tank Pumping Services - North Fork Evergreen Tributaries Implementation
Term Contract
Post-Bid
VA

Royal Street Sewer Separation
Results
$247,400 est. value
Alexandria, VA

Manhole and Lateral Lining Rehabilitation
Term Contract
Post-Bid
VA

Last Updated 11/29/2018 12:49 PM
Project Title

Sewer Spot Repairs Shannon Road

Physical Address View project details and contacts
City, State (County) Portsmouth, VA   (Portsmouth City County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description Replace approximately 20 linear feet of 8" C900 PVC pipe, replace one (1) lateral as designated, install approximately 210 linear feet of CIPP liner in 8" sewer main, rehab three (3) manholes and mill and overlay approximately 70 square yards of pavement. 1. The Contractor shall obtain and pay for all permits required to complete this project which were not obtained by the city. Permits shall be obtained at no additional cost to the project. The Contractor shall comply with the requirements of all permits related to the work, whether obtained by the Contractor or the City. 2. Replace 8" sewer pipe with 8" C900 PVC pipe as designated. 3. Replace one (1) lateral as designated. 4. Install CIPP liner in 8" main as designated. 5. Rehab manholes #2220, #2155 and #2305 as designated. 6. Restore pavement, driveways and,or curb and gutter to meet requirements of the Engineering Department or as designated. 7. Properly dispose of all excess material and debris. 8. Restore site conditions and landscaping, topsoil and re-seed disturbed areas as determined by pre-video site inspection
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents