Similar Projects
Kelley Park Outfall - City Of San Jose
Infrastructure
Conception
$772,000 est. value
San Jose, CA 95112

Central Service Yard - Water Main Replacement - City Of San Jose
Infrastructure
Conception
San Jose, CA 95112

Churchill Avenue/Alma Street Railroad Crossing Safety Improvements - PL-20000 - City of Palo Alto
Infrastructure
Design
$4,776,592 CJ est. value
Palo Alto, CA 94306

RFQ Contractor - Pre-Qualification - Facility-Wide Water System Improvements
Infrastructure
Bidding
$100,000 CJ est. value
San Jose, CA 95113

Two (2) Turnouts Project
Infrastructure
Bidding
$950,000 CJ est. value
Palo Alto, CA 94301

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

On-Call Plumbing Services
Alteration
Post-Bid

Plumbing Services
Term Contract
Results
$200,000 est. value
San Jose, CA 95128

Combination Pressure Reducing and Pressure Sustaining Valves
Term Contract
Results
Santa Clara, CA

Water Main Replacement - Project 29 - WS-15002 - City of Palo Alto
Infrastructure
Pending Verification
$8,500,000 CJ est. value
Palo Alto, CA 94301

New Trunk Line - 308a08 - City Of Morgan Hill
Infrastructure
Conception
$30,300,000 est. value
Morgan Hill, CA

FOCP Coyote Creek SAFPM Chillers Plant Project
Renovation, Infrastructure
Bidding
$4,500,000 CJ est. value
Morgan Hill, CA 95037

SBWR Metering and Pressure Monitoring Improvements
Infrastructure
Post-Bid
$1,980,000 est. value
San Jose, CA

Citywide Water Line Replacement
Infrastructure
Results
$5,853,200 est. value
Sunnyvale, CA

Gas Main Replacement - Project 25 - GS-15000 - City of Palo Alto
Infrastructure
Conception
$7,134,300 CJ est. value
East Palo Alto, CA 94303

Last Updated 08/04/2022 03:31 AM
Project Title

Public Works General Engineering Contract for Pipe Facilities 2022-2024 Re-Bid

Physical Address View project details and contacts
City, State (County) San Jose, CA 95112   (Santa Clara County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Plumbing, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally involves a series of moderately complex, emergency pipe system repairs or improvement projects. The contract will be valid for a two-year term. Each bid must be accompanied by cash, a certified check, a cashier's check or a bidder's bond in the sum of not less than 10% of the total aggregate amount of the bid. Checks shall be made payable to the order of the City of San Jose. Bonds shall be executed by a surety possessing a valid certificate of authority issued by the California Department of Insurance and shall name the City of San Jose as beneficiary. All bids must be addressed to the Director of Public Works, City of San Jose, shall bear the Project Number and Name and be in a sealed envelope. This project is a "public works" as defined in Sections 1720 through 1720.6 of the California Labor Code. In accordance with Chapter 14.09 of the San Jose Municipal Code entitled "Prevailing Wage Requirements for City Contracts Involving Public Works," the contractor will be required to comply with the prevailing wage provisions in California Labor Code Sections 1720 through 1861, and the City's Office of Equality Assurance is authorized to provide certain local enforcement of those provisions. As such, the contractor will need to pay not less than the general prevailing rate of per diem wages and the general prevailing rates for holiday and overtime work. Bidders must have a California contractor's license, classification A to bid this project. Bidder's attention is directed to those provisions of the Specifications which require the contractor to whom the contract for the work is awarded, to file with the City Clerk at the time the contract is executed, a Contractor's Payment Bond and a Bond for Faithful Performance meeting all the requirements of the Specifications and approved by the City Attorney of the City of San Jose. Bonds shall be executed by a surety possessing a valid certificate of authority issued by the California Department of Insurance and shall name the City of San Jose as beneficiary. The Contractor's Faithful Performance Bond shall be for 100% of the contract amount. The Contractor's Payment Bond shall be for 100% of the contract amount. Question Deadline 07/21/2022 03:00:00 PM PT

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents