Similar Projects
Hollybrook Park Property Construction
New Construction
Conception
Wendell, NC 27591

Hilltop Needmore Town Park and Preserve Park
New Construction, Renovation
Conception
Fuquay-Varina, NC 27526

Rock Quarry Landing
New Construction
Design
$34,000,000 est. value
Raleigh, NC

Albemarle Landing
New Construction
Design
$24,500,000 est. value
Charlotte, NC 28212

Mazarick Park Tennis Center
New Construction
Bidding
Fayetteville, NC 28305

Whiteville High School Tennis Courts and Parking Lots Project
New Construction, Infrastructure
Bidding
Whiteville, NC 28472

Student Recreation Center Walton Drive Facility
New Construction
Sub-Bidding
$75,000,000 est. value
Wilmington, NC

Abernathy and Waymer Parks Athletic Field Lighting
Post-Bid
Huntersville, NC 28078

John Chavis Memorial Park Running Track Resurfacing
Post-Bid
Raleigh, NC 27601

The Parks and Recreation Ballfield Fencing
Results
Less than $29,832 est. value
Durham, NC 27713

Infield Laser Grade for Baseball and Softball Fields
Term Contract
Results
Wilmington, NC 28403

Woodfield Landing
New Construction
Construction
$13,500,000 est. value
Havelock, NC

Pleasant Park
Construction
Less than $36,000,000 est. value
Apex, NC 27502

Holland Road - Mixed Use Assembly
New Construction - 76,500 SF
Conception
Apex, NC 27502

Ballantyne Reimagined - Stream Park
New Construction
Design
Charlotte, NC 28277

Last Updated 04/14/2022 10:31 AM
Project Title

South Second Street Basketball Court

Physical Address View project details and contacts
City, State (County) Mebane, NC   (Alamance County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $126,320
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK The Scope of Work for this project consists of constructing a basketball court at the southeast corner at the intersection of South Second Street and West Lee Street. Contractor shall grade the site to proposed grades shown on drawings, install a 64' X 98' asphalt basketball court with goals and perimeter fencing. The work will include the following: 1. Add suitable fill material to grade court to proposed grade as shown on drawings. Note: fill material will be allowed to be placed over top of existing ABC stone within court area. 2. Installation of approximately 20 LF of 8" PVC pipe and grate inlet including replacement of concrete sidewalk required for pipe installation. 3. Court shall consist of minimum 6" ABC stone base and 2" S 9.5 B Surface Course. 4. Provide 8' high galvanized black vinyl fencing system, 9 gauge fabric, 2" mesh with 3" OD terminal posts, 2.5" OD in-line posts, 1.5" OD top rail, 7 gauge bottom tension wire, corner braces, truss rods, two single leaf gates (5' X 7' with transom), one double leaf gate (12' X 7' with transom) and all associated hardware. 5. Provide two (2) LEGEND basketball goal systems, with 42" X 72" tempered glass backboards with 5"square 3/16" posts and extension arm with 5'-6" safety setback, standard goal with breakaway rim. Install post in 20" diameter hole, 48" deep encased with concrete. See attached drawing at end of section. 6. Provide four (4) Force basketball goal systems with 36" X 54" tempered glass backboards with 5"square 3/16" posts and extension arm with 4'-0" safety setback, standard goal with breakaway rim. Install post in 20" diameter hole, 42" deep encased with concrete. See attached drawing at end of section. 7. After 30-day asphalt curing, patch low areas in court area with acrylic patching material, and finish court with two (2) sand filled coats of Laykold Acrylic Resurfacer (or equal) and one (1) sand filled and one(1)finish coat of Laykold Color Coat (or equal). Install in accordance with manufacturer's specifications. 8. Paint 2" playing lines with Laykold Textured White Acrylic Line Paint (or equal), to include center court, 3 point lines, free throw lines with shooting key and out of bounds line for main court, and 3' long free throw lines for the secondary goals. Secondary goal lines to be painted in a different color. 9. Install a 24’ X 20’ 6” thick concrete pad for two (2) handicap spaces including a 5’ X 8’ connecting sidewalk. Relocate existing signs to center of parking spaces. Paint symbols onto pavement including center aisle.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents