Similar Projects
Canal Replacement Cost Share - Segment 5 - City of Brentwood
Infrastructure
Conception
$4,986,270 est. value
Brentwood, CA

Cerritos Drive to Dunning Drive Access and Drainage Improvements - City of Laguna Beach
Alteration
Conception
$400,000 est. value
Laguna Beach, CA

Foothills Park Improvement Project - PE-21000 - City of Palo Alto
New Construction, Renovation, Infrastructure
Design
$397,200 est. value
Los Altos, CA 94022

Replace Existing Rock Slope Protection
Infrastructure
Design
$5,260,000 est. value
Riverside, CA

Install JPCP(RSC), LCB Rapid Setting, Class 3 AB, Slab Replacement
Infrastructure
Bidding
$120,000,000 est. value
Palmdale, CA 93550

San Bernardino Class 1 Bike Trail Project
Infrastructure
Bidding
$2,000,000 est. value
South Lake Tahoe, CA 96150

American River Common Features 2016 Erosion Protection Project
Term Contract
Post-Bid
Sacramento, CA 95814

Construct Retaining Wall, Culvert and Place HMA
Infrastructure
Post-Bid
$13,600,000 est. value
Butte Valley, CA

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Upper Mormon Slough Critical Erosion Repair
Infrastructure
Results
$5,387,900 to $6,136,214 est. value
Escalon, CA 95320

Storm Drain Improvements - City of Eureka
Infrastructure
Conception
$7,000,000 est. value
Eureka, CA

Offshore Outfall Inspection Project
Infrastructure
Bidding
Watsonville, CA

SB Minor B - Drainage Improvement
Infrastructure
Post-Bid
$295,143 est. value
CA

Construct Soldier Pile Wall
Infrastructure
Results
$1,750,000 est. value
CA

FY2022-23 Woodcreek Golf Facility Renovations and Restoration - 500297 - City of Roseville
Alteration
Conception
$800,000 est. value
Roseville, CA 95747

Last Updated 07/07/2022 02:20 PM
Project Title

2018 Bond for Embarcadero Seawall Upgrades -Seawall Fortification Bond - Port of San Francisco

Physical Address View project details and contacts
City, State (County) San Francisco, CA   (San Francisco County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Design Development, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $425,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a $425 million bond measure to securing 3 miles of shoreline from the threat of earthquakes and sea-level rise. The bond for this project was passed and approved by the voters on November 6, 2018. As of July 6, 2022, the first portions of the new seawall are anticipated to be installed in September 2022. Information regarding a design team or a general contractor is not available. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents