Similar Projects
Mill Creek Subdivision
New Construction
Design
Frederick, MD

West Nursery Commercial Center
Design
Linthicum Heights, MD 21090

GAF Newkirk West Expansion
New Construction - 49,600 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Baltimore, MD 21224

Dorchester Marketplace
Post-Bid
Cambridge, MD 21613

Franklin High School Concession Stand and Emergency Access
Results
$500,000 to $1,000,000 est. value
Reisterstown, MD 21136

Prime Contracting Services for the Utilities Upgrades and Site Improvements Project Phase II
Results
Baltimore, MD

Saints Peter And Paul - Parish and School
New Construction
Construction
$18,000,000 est. value
Easton, MD 21601

Mace Medical Offices
New Construction - 14,400 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Dundalk, MD 21222

Sun East Clear View Farms Solar Facility
New Construction
Pending Verification
West Friendship, MD

Colora Solar Project
New Construction
Pending Verification
Colora, MD

Wakefield Solar Facility
New Construction
Design
New Windsor, MD

Athena Plaza - Site Work
New Construction
Post-Bid
Berlin, MD 21811

Elevation of 5 Residential Structures
Results
Crisfield, Towson, Westover, MD 21204

South End Shopping Center Bank - Sitework
Renovation
Construction
Hagerstown, MD 21740

Freyer Lane Solar Farm
New Construction
Pending Verification
Conowingo, MD

Last Updated 06/13/2022 03:03 PM
Project Title

PEPCO Champlain Substation Replacement

Physical Address View project details and contacts
City, State (County) Hyattsville, MD 20783   (Prince Georges County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Power Plant, Site Development
Contracting Method
Project Status Obtained from a Public Office, Construction Start Expected March 2024, Construction Completion Expected January 2026
Bids Due View project details and contacts
Estimated Value $16,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the replacement and upgrade of the existing substation. As of As of June 2022, the project is in the design phase. Information regarding the general contractor and method of selection has not been disclosed. A construction timeline has not been determined, but construction is expected to be complete in 2026.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Power Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, High-Performance Structural Concrete, Concrete Finishing, Specialty Placed Concrete, Precast Structural Concrete, Precast Concrete Specialties.
Division 04 - Masonry, Unit Masonry, Concrete Form Masonry Units.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Coiling Doors and Grilles, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Safety Specialties, Emergency Aid Specialties, Fire Protection Specialties, Exterior Specialties, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Security Equipment.
Division 13 - Special Construction, Radiation Protection, Special Instrumentation, Seismic Instrumentation.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Personal Protection Systems, Electronic Detection and Alarm, Fire Detection and Alarm, Radiation Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Earthwork Methods, Soil Treatment, Soil Stabilization.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Site Improvements, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Fuel Distribution Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution, Utility Substations, Utility Transformers, High-Voltage Switchgear and Protection Devices, Medium-Voltage Utility Switchgear and Protection Devices, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors, Cranes and Hoists.
Division 46 - Water and Wastewater Equipment.
Division 48 - Electrical Power Generation, Common Work Results for Electrical Power Generation, Instrumentation and Control for Electrical Power Generation, Electrical Power Generation Equipment, Electrical Power Generation Testing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents