Similar Projects
Pipe and Fittings
Term Contract
Post-Bid
Augusta, GA

Highway 119 Water Main Replacement
Post-Bid
Springfield, GA 31219

Hunt Road Utility Extensions
Results
Valdosta, GA

Wyckoff/Mars Hill Road 42 Pipeline Replacement
Results
Less than $7,000,000 est. value
Marietta, GA

Watermain Replacement
Post-Bid
Cochran, GA 31014

Sharon Drive Waterline Replacement
Results
Powder Springs, GA

Small Domestice Brass Fittings and Gate Valves
Term Contract
Post-Bid
Decatur, GA

Ranger Transmission Main
Results
Less than $700,000 est. value
Calhoun, GA

HDPE Pipe Liners
Term Contract
Post-Bid
GA

Underground Enclosures/Meter and Detection Check Boxes and Vaults for the Department of Watershed Management
Term Contract
Results
Atlanta, GA

Martin Street Water Main Replacement
Post-Bid
Jefferson, GA

South Main/Pine Ridge Reuse Extension
Results
Hinesville, GA 31310

South Industrial Park Phase I
Post-Bid
Eatonton, GA

Cass-White Road Water and Sewer Utility Relocations
Results
Bartow, GA

North Landing Way Area Water Main Replacement
Post-Bid
GA

Reported 11/30/2018 12:00 AM
Project Title

2019 Annual Labor Water Line Installation Contract

Physical Address View project details and contacts
City, State (County) McDonough, GA 30252   (Henry County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description Labor and equipment necessary to install, relocate, and rehab water lines and the appurtenances thereto at the request and under the direction of the Authority. Labor and equipment necessary to install, relocate, and/or rehab water lines 2" to 24" in diameter, fire hydrants, appurtenances thereto, and the repair of driveways and roads across which water lines are constructed according to the specifications of the Authority on an "as needed" basis. Bids submitted for the above stated services shall be for a period commencing January 1, 2019 and terminating December 31, 2019.
Details
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents