Similar Projects
North Caln Road Area Sewer Modifications
Bidding
Less than $110,000 est. value
Coatesville, PA 19320

Upland Farms Barn Renovation Sanitary Sewer and Water Connection
Bidding
Chester Springs, PA

Manhole Frame and LID Rehabilitation
Post-Bid
Pottstown, PA 19464

Ponds Edge Road Slip Lining
Post-Bid
West Chester, PA 19382

North Valley Road Area Sanitary Sewer Replacement Project
Results
$400,000 est. value
Pottstown, PA 19464

Regal Oaks IIA and Gilbertsville Road Sewer Extension
Results
$525,000 est. value
Pottstown, PA 19464

Sanitary Sewer System Maintenance, Repair, And Emergency Response Services
Results
$25,000 est. value
Devon, PA 19333

2019 Phase I Interceptor Repairs Project - Sanitary Sewer Rehabilitation
Results
$350,000 to $400,000 est. value
West Chester, PA 19380

2019 Phase 1 Interceptor Repairs Project - Sanitary Sewer Main Replacement
Results
$950,000 to $1,000,000 est. value
West Chester, PA 19380

Sewer Cleaning and Televising
Results
West Chester, PA

Cured In Place Pipe Lining Multiple Locations
Results
Tredyffrin, PA 19312

Public Restrooms and Other Improvements at the East Fallowfield Park - Electric Contract
Results
$120,000 to $140,000 est. value
Coatesville, PA 19320

Ming Drive and West Moyer Road Sewer Extension
Term Contract
Results
$625,000 est. value
Pottstown, PA 19464

Route 401 Area Sanitary Sewers - Phase 1
Results
Frazer, PA 19355

Caln Interceptor Repairs - Phase 3
Results
$236,000 est. value
Thorndale, PA 19372

Last Updated 01/10/2020 12:02 PM
Project Title

Sharps Woods Gravity Sewer and Force Main Replacement

Physical Address View project details and contacts
City, State (County) Devon, PA 19333   (Chester County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,300,000 to $1,600,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project: Sharp’s Woods Gravity Sewer and Force Main Replacement: The project generally consists of not only the in place replacement of approximately 3,200 feet of existing 8” and 10” diameter ACP gravity sanitary sewer main and manholes with 10” and 12” diameter PVC gravity sewer main and manholes, but also the replacement of approximately 3,150 feet of existing 8” diameter ACP force main with 8” HDPE or PVC force main. Sharp’s Woods Interceptor and Force Main: Estimated flows for bypass operations: 1. Daylesford Pump Station and Manhole #563, Morris Lane: The average daily flow is estimated to be 503,000 gallons per day (gpd). The maximum daily flow is estimated to be 697,000 gpd. The peak flow is estimated to be 31,000 gallons per hour. See Plan Sheet PP6 for location of Manhole #563. 2. Manhole #568, Leopard Road: The average daily flow is estimated to be 163,000 gpd. The maximum daily flow is estimated to be 225,000 gpd. See Plan Sheet PP5 for location of Manhole #568. 3. Manhole #611, Byrd Drive: The average daily flow is estimated to be 34,000 gpd. The maximum daily flow is estimated to be 47,000 gpd. See Plan Sheets PP2 and MD2 for location of Manhole #611. 4. Manhole #748, Argyle Road: The average daily flow is estimated to be 98,000 gpd. The maximum daily flow is estimated to be 136,000 gpd. See Plan Sheet PP1 for location of Manhole #748. 5. Manhole #752, Hawthorne Place: The average daily flow is estimated to be 3,000 gpd. The maximum daily flow is estimated to be 4,000 gpd. See Plan Sheet PP2 for location of Manhole #752. 6. Manhole #1098, Sharp’s Woods Easement: The average daily flow is estimated to be 177,000 gpd. The maximum daily flow is estimated to be 245,000 gpd. See Plan Sheet PP1 for the location of manhole #1098. 7. Manhole #1492, Leopard Road Easement: The average daily flow is estimated to be 19,000 gpd. The maximum daily flow is estimated to be 27,000 gpd. See Plan Sheet PP5 for the location of Manhole #1492. 8. Manhole #1504, Sharp’s Woods Easement: The average daily flow is estimated to be 335,000 gpd. The maximum daily flow is estimated to be 464,000 gpd. See Plan Sheet PP4 for the location of Manhole #1504. 9. Manhole #567, Leopard Road: The average daily flow is estimated to be 498,000 gpd. The maximum daily flow is estimated to be 689,000 gpd. See Plan Sheet PP5 for the location of Manhole #567. 10. During rain storm events peak flows could increase by as much as twenty-five per cent (25%) at the noted manholes.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents