Similar Projects
2022 Quaker Valley Culvert Reconstruction Project
Infrastructure
Design
Farmington Hills, MI

Davisburg Mill Pond Dam Removal and River Restoration
Renovation
Bidding
Davisburg, MI 48350

Rochester High School Storm Drainage Projects
Post-Bid
Rochester Hills, MI 48309

Mercer Beach Improvements Phase 1
Infrastructure
Post-Bid
Walled Lake, MI

Riverside Bank Stabilization 2020
Results
Auburn Hills, MI

Lee Begole Drive Headwall Reconstruction / Bishop Creek Streambank Restoration
Results
Less than $940,384 est. value
Novi, MI 48375

Lahser Road Drainage Repairs
Infrastructure
Post-Bid
Beverly Hills, MI 48025

11 Mile Road over Novi-Lyon Drain Culvert Replacement
Results
Beverly Hills, MI

Maloney Avenue over Clear Lake/Long Lake Canal Box Culvert Furnish and Deliver
Infrastructure
Post-Bid
Beverly Hills, MI

Corrugated Metal Pipe, Bands, And Bolts
Results
Beverly Hills, MI

Union Lake Road Over Hayes Drain
Results
Less than $970,000 est. value
Beverly Hills, MI

Beach Erosion Control at Camp Dearborn
Results
Milford, MI 48380

Milford Road over Buckhorn Creek
Results
Beverly Hills, MI

Drainage Structure Repairs and Concrete Curb And Gutter
Results
MI

Trench Drain and Asphalt Repair
Results
Bloomfield Hills, MI

Last Updated 03/07/2022 03:10 AM
Project Title

Bald Eagle Lake Drain Restoration

Physical Address View project details and contacts
City, State (County) Waterford, MI   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing Bald Eagle Lake Drain consists of an overflow drain between Bald Eagle Lake and Lake Louise in Ortonville, Michigan. The upstream end of the drain is located near the northeast corner of Bald Eagle Lake. The drain crosses below M-15 and generally runs parallel to E Glass Rd (in the right-of-way area) for about 2,000 feet before changing over to an open-channel system that discharges at the north end of Lake Louise.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents