Last Updated 03/13/2020 05:34 AM
Project Title

Reconstruction/Rehabilitation - Colleton Co

Physical Address View project details and contacts
City, State (County) SC   (Colleton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Construction Stakes, Lines & Grades 18.000 Ea Traffic Control 1.000 Ls Removal & Disposal Of Existing Pavement 647.000 Sy Unclassified Excavation 255.000 Cy Borrow Excavation 5,176.000 Cy Excavation For Shoulder Paving 486.900 Sta Hauling Of Excavated Shoulder Material 486.900 Sta Additional Rock For Full Depth Reclamation 2,085.250 Ton Cement Modified Recycled Base (10" Unif)-Curing Method b 71,455.998 Sy Cement Modified Recycled Base (12" Unif)-Curing Method b 64,793.030 Sy Portland Cement For Cement Modified Recycled Base Course 4,880.480 Ton Maintenance Stone 109.270 Ton Hot Mix Asphalt Base Course - Type a 1,897.280 Ton Liquid Asphalt Binder Pg64-22 1,907.575 Ton Full Depth Asph. Pav. Patching 6" Unif. 2,431.000 Sy Full Depth Asph. Pav. Patching 8" Unif 5,231.000 Sy Milling Existing Asphalt Pavement 1.0" 21,309.000 Sy Milling Existing Asphalt Pavement 1.5" 18,225.800 Sy Milling Existing Asphalt Pavement 1.75" 23,710.000 Sy Milling Existing Asphalt Pavement 2.0" 45,000.000 Sy Milling Existing Asphalt Pavement (Variable) 4,895.000 Sy Milled-In Rumble Strip 22.240 Mi Hot Mix Asphalt Surface Course Type b 4,414.994 Ton Hot Mix Asphalt Surface Course Type c 14,685.984 Ton Hot Mix Asphalt Surface Course Type d 10,065.688 Ton Driveway Paving-Surface Type c 608.125 Ton Driveway Paving-Surface Type d 656.000 Ton Permanent Construction Signs (Ground Mounted) 5,944.000 Sf Pave. Mark.(Temp-Paint)12inx18in White Triangle Yield Bar 90.000 Lf 4" White Broken Lines(Gaps Excl.)Perm.Pvmt.Marking 1,850.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Perm.Pvmt.Marking 93,396.000 Lf 8" White Solid Lines Perm.Pvmt.Markings 1,260.000 Lf 12in x 18in White Triang. Yield Bar (Gaps Exc)Perm.Pvmt.Mark 30.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Perm.Pvmt.Marking 809.000 Lf White Single Arrows (Lt, Strght, Rt) Perm.Pvmt.Marking 10.000 Ea White Word Message "Only" -Perm.Pvmt.Marking 10.000 Ea 4" Yellow Broken Lines(Gaps Exc)Perm.Pvmt.Marking 8,670.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Perm.Pvmt.Marking 49,290.000 Lf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 5,764.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 345,694.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 3,780.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 3,645.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 30.000 Ea White Word Message "Only"-Fast Dry Paint 30.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 30,020.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 252,862.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 1,100.000 Lf 6"Yel Solid Lines On 6"Conc.Curb(Top&Side)-Fast Dry Pnt 2,830.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 96.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 152.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 1,352.000 Ea 4" White Broken Lines- (Gaps Excld) - Single Component Hybridize Polymer– 20 Mils 118.000 Lf 4" White Solid Lines-(Pavement Edge Lines)-Single Component Hybridized Polymer–20 Mils 32,244.000 Lf 8" White Solid Lines-(Cross Walk & Channelization)-Single Component Hybridized Polymer–20 Mils 140.000 Lf 24" White Solid Lines-(Stop/Diagonal Lines)-Single Component Hybridized Polymer–20 Mils 577.000 Lf 4" Yellow Broken Lines (Gaps Excluded) - Single Component Hybridized Polymer - 20 Mils 2,680.000 Lf 4" Yellow Solid Lines (Pavement Edge & No Passing Zone) - Single Component Hybridized Polymer - 20 Mils 40,274.000 f Furnish & Install 1.0" Schedule 80 Pvc Conduit 300.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 4,500.000 Lf Sawcut For Loop Detector 2,120.000 Lf Concrete Sidewalk(4" Uniform) 616.000 Sy Detectable Warning Material 10.000 Sf Concrete Driveway(6" Uniform) 21.000 Sy Pedestrian Ramp Construction 10.000 Sy Surface Applied Detectable Warning 20.000 Sf Permanent Grassing For Non-Permitted Resurfacing Projects 16.309 Acre Silt Fence 2,600.000 Lf

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents