Similar Projects
State Street Apartments
New Construction - 62,295 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
New Haven, CT

State Street Apartments
Renovation
Conception
New Haven, CT 06510

Bee Street Independent Living
New Construction - 107,000 SF
Design
Meriden, CT 06450

Residential Development
New Construction, Renovation, Demolition
Design
$3,400,000 est. value
New Haven, CT 06511

Antillean Manor
New Construction, Demolition - 46,700 SF
Sub-Bidding
$8,000,000 est. value
New Haven, CT 06500

Fairmont Heights Kitchen & Bathroom Renovations
Renovation
Post-Bid
New Haven, CT 06513

Lead Abatement & Interim Control Measures In 4 Developments
Renovation
Post-Bid
New Haven, CT

504 Upgrades - Phase 4
Renovation
Results
Less than $809,500 est. value
Waterbury, CT 06704

ADA Improvements at Cicia Manor
Renovation
Results
Less than $482,800 est. value
Derby, CT 06418

Canal Crossing
New Construction
Construction
$40,000,000 est. value
Hamden, CT 06514

JFA Management - Apartments
New Construction
Construction
Wallingford, CT 06492

Meriden Green
New Construction
Pending Verification
Meriden, CT

Mill shop conversion
Renovation - 10,000 SF
Pending Verification
New Haven, CT

Stone Bridge Crossing - Apartments
New Construction
Conception
Cheshire, CT

Hill Central Redevelopment - Phase I
New Construction, Demolition
Design
$30,000,000 est. value
New Haven, CT

Reported 01/27/2021 12:00 AM
Project Title

Fire Pump and Vestibule Upgrades at George Crawford Manor

Physical Address View project details and contacts
City, State (County) New Haven, CT 06511   (New Haven County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Consists of the following: 1. New entrance vestibule replacing existing. 2. Temporary entrance during vestibule construction. 3. Doors and frames. 4. Penetration firestopping. 5. Electrical work. 6. Access control and intercom system modifications, including temporary provisions. 7. Replacement of fire pump and related controller.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 05 - Metals.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 21 - Fire Suppression.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 32 - Exterior Improvements, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents