Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$460,000 CJ est. value
Scott, PA 17815

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

SR 4057 over Brush Run
Infrastructure
Design
$3,175,000 CJ est. value
Blaine Township, PA 15312

SR 4022 over Bridge Buffalo Creek
Demolition, New Construction, Infrastructure
Design
$1,285,712 CJ est. value
Washington, PA 15301

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - Washington County Cross Creek Trail
Infrastructure
Bidding
$200,000 CJ est. value
Cross Creek, PA 15021

Township Public Works Facility - Early Site Package
Infrastructure
Post-Bid
Cecil, PA

22 Mawhinney Road Site Clean-Up
Infrastructure
Post-Bid
Cecil, PA 15321

North Charleroi Secondary Feed Waterline
Infrastructure
Results
$355,000 est. value
Charleroi, PA

Ridge Road PRV Project
Infrastructure
Results
$106,000 est. value
Centerville, PA 15417

Abandoned Mine Reclamation (AMR) Monongahela South No. 1 - Phase 2
Infrastructure
Construction
$493,352 CJ est. value
Monongahela, PA 15063

PA 88 SB - Charleroi CMAQ
Infrastructure
Conception
$3,380,400 CJ est. value
Finleyville, PA 15332

PA 18 over Chartiers Creek-2
Demolition, New Construction, Infrastructure
Design
$2,130,818 CJ est. value
Washington, PA 15301

Glencannon Area CIPP Lining Project
Infrastructure
Bidding
$550,000 CJ est. value
Canonsburg, PA 15317

Municipal Water and Sewage Repair
Infrastructure
Post-Bid
Claysville, PA

Last Updated 01/03/2023 09:32 AM
Project Title

Fairway Estates Force Main Relocation Project

Physical Address View project details and contacts
City, State (County) McMurray, PA 15317   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $88,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Estimated value $400,000 - $800,000 The project includes the following work: Construction of approximately 920 lf of 2-inch dr-11 hdpe force main with new connections from existing valve vault to existing discharge manhole. Bids are requested for the following contract: contract 2022-01 general construction All official notifications, addenda, and other bidding documents will be offered only through the designated website. Neither owner nor engineer will be responsible for bidding documents, including addenda, if any, obtained from sources other than the designated website. Clarification deadline 12/6/2022 4:00 pm Bid security in the form a certified check or bid bond shall be furnished with the bid in an amount not less than 10%. All questions about the meaning or intent of the bidding documents are to be submitted in accordance with the instructions to bidders. Telephone inquiries are unacceptable. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the instructions to bidders that are included in the bidding documents. Statutory requirements. Bidders must comply with all state antibid-rigging regulations pertaining to work associated with this project, and will be required to submit an executed non-collusion affidavit with the bid. Bidders should refer to provisions of federal and state statutes, rules and regulations dealing with the prevention of environmental pollution and preservation of public natural resources that affect the project, pursuant to act no. 247 of the general assembly of the commonwealth of pennsylvania, approved october 26, 1972. This project falls under the commonwealth of pennsylvania enacted act 127 of 2012, known as the public works employment verification act (the act) which requires all public work contractors and subcontractors to utilize the federal governments e-verify system to ensure that all employees performing work on public work projects are authorized to work in the united states. All bidders are required to submit a public works employment verification form as a precondition for the contract award. The estimated cost for this project is greater than twenty-five thousand dollars ($25,000) and the pennsylvania prevailing wage act shall apply. All bids shall be irrevocable for 60 days after the bid opening date as provided by the act of november 26, 1978 (p.L. 1309, no. 317), as amended by the act of december 12, 1994 (p.L. 1042, no. 142). The authority reserves the right to waive any defects, errors, omissions, mistakes, informalities, to accept any bid or combination of bids that are deemed to be in the best interest of the authority, and to reject any or all proposals *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents