Northern Plains Nitrogen Fertilizer Plant
New Construction, Infrastructure
Conception
$200,600,000 CJ est. value
Grand Forks, ND 58202

Soybean Crush Plant Mixed Use Development / Grand Forks
New Construction, Infrastructure
Design
$400,000,000 CJ est. value
Grand Forks, ND 58201

Soybean Crush Plant Mixed Use Development / Grand Forks
New Construction, Infrastructure
Design
$400,000,000 CJ est. value
Grand Forks, ND 58201

Disaster Resiliency Program (DRP) Formal Training Unit Building 631
Infrastructure, Renovation
Bidding
$100,000,000 CJ est. value
Gfafb, ND 58204

Disaster Resiliency Program (DRP) Formal Training Unit Building 631
Infrastructure, Renovation
Bidding
$100,000,000 CJ est. value
Gfafb, ND 58204

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Career Impact Academy / Grand Forks
New Construction, Infrastructure - 56,900 SF
Post-Bid
$28,000,000 CJ est. value
Grand Forks, ND 58201

2022 Sanitary Sewer, Watermain and Storm Sewer Repairs
Infrastructure
Results
$305,052 est. value
Grand Forks, ND

2022 Watermain Replacement
Infrastructure
Results
$1,184,396 est. value
Grand Forks, ND

Roundabout - City Of Grand Forks
Infrastructure
Pending Verification
$860,000 CJ est. value
Grand Forks, ND 58203

The Listen Center
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Grand Forks, ND 58201

Main Street - Mill and Pave
Infrastructure
Bidding
$400,000 CJ est. value
Grand Forks, ND 58201

2022 Water Meters
Infrastructure
Post-Bid
Grand Forks, ND

Recycled HBP Overlay & Milling Surface County Road #6
Infrastructure
Results
$1,462,847 CJ est. value
Grand Forks, ND 58201

Red River High School Kraft Field Redevelopment
Infrastructure, Renovation
Pending Verification
$514,745 CJ est. value
Grand Forks, ND 58201

Last Updated 04/25/2023 02:06 PM
Project Title

LS 49 and Force Main Schedule C Forcemain

Physical Address View project details and contacts
City, State (County) Grand Forks, ND 58201   (Grand Forks County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,143,200 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Lift Stations/Lift Station Equipment, Sewer Pump Station, Sewer Force Main, Water/Wastewater Infrastructure, Construction, Landscaping The scope of work generally consists of the following: General Work: Construct a new lift station including 24' diameter cast in place concrete barrel to be installed by sinking, a 28'x36' precast control building, spiral stairs and catwalks, submersible pumps, check valves and piping, roofing, painting, trees, grass restoration, and miscellaneous Work. Mechanical Work: Building ventilation systems including intake and exhaust ducts, dampers, fans, ductwork and controls, and a cabinet ventilation system including intake, filters, heater, fan controls, ductwork and miscellaneous Work. Electrical Work: New electrical service, CT cabinet, disconnects, transfer switches, distribution panel, lighting panel, supervisory control system, lighting, telemetry and miscellaneous Work. Forcemain Work: 1,400 LF of 12" PVC force main, bypass riser, force main drain down, tapping sleeve, connection to existing force main, new 12" gate valves, grass restoration, and miscellaneous Work. Bids will be lump sum price in accordance with the following schedules: Schedule A - Consists of a single prime contract for General Work, Mechanical Work, and Electrical Work combined. Schedule B - Consists of separate prime contracts for General Work, Mechanical Work, and Electrical Work for Lift Station. Bidder is not required to submit bids for each but may do so if he chooses. Bidder may submit a single bid for General Work, Mechanical Work, Electrical Work or a combination. Bidder may bid any or all schedules as he chooses. If Agreement is to be awarded, a single agreement for Schedule A or three separate Agreements for Schedule B will be awarded for the schedule resulting in the lowest total project bid. Schedule C - Is a separate schedule for the Forcemain work. All work is to be in accordance with the Bidding Documents which are on file in the office of the City Engineer, Grand Forks, North Dakota, reference to which is made for detailed description of the work. Each bid must be accompanied by a separate PDF document (uploaded to Quest VirtuBid) containing an acceptable bidder's bond in a sum equal to five percent of the full amount of the bid, executed by the bidder as principal and by a surety, conditioned that if the principal's bid be accepted and the contract awarded to the principal, the principal, within ten days after notice of award, will execute a contract in accordance with the term of the bid and a contractor's bond as required by law and the regulations and determinations of the Grand Forks City Council. Bidders on this work will be required to comply with Title 40 CFR Part 33- Participation by Disadvantaged Business Enterprises in the United States Environmental Protection Agency Programs. The requirements for bidders and contractors under this regulation concern utilization of Minority Business Enterprises (MBE), Women's Business Enterprises (WBE), and Small Business Enterprises (SBE) and are explained in the specifications. Bidders on this work will be required to comply with the President's Executive Order No. 11246, as amended. The requirements for bidders and contractors under this order are explained in the specifications. Bidders on this work will be required to comply with American Iron and Steel requirements of the Consolidated Appropriations Act, 2014. The requirements for bidders and contractors under this regulation are explained in the specifications. Additional Description: The City Council reserves the right to reject any or all bids and/or to waive any informality in the bids received and to accept any bid deemed to be most favorable to the interest of the City of Grand Forks. The successful bidder shall warrant and guarantee work for two years and shall furnish performance and payment bonds, in the amount of 100% of the contract. Bonds shall remain in effect until two years after date of final payment. Within fifteen (15) days after effective date of Agreement, Contractor shall submit to Owner a written notice indicating the specific date that Contractor will begin construction. Unless extended as per Article 11 of the General Conditions, Schedule A or B, Milestone "A" (All work with the exception of grass and landscaping) shall be completed by June 30, 2024, and all work shall be completed and ready for final payment in accordance with paragraph 15.06 of the General Conditions no later than October 15, 2024; Schedule C, Milestone "A" (all work requiring forcemain shut-down) shall be completed within 3 calendar days, and all work shall be completed and ready for final payment in accordance with paragraph 15.06 of the General Conditions no later than October 31, 2023. Bid results - Option 1 SRF Compliant Schedule C - Forcemain - United Crane & Excavation - $612,100.00 Option 2 Non SRF Schedule C - Forcemain - United Crane & Excavation - $531,100.00

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans