Similar Projects
AutoZone #3640 / Zephyrhills
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Zephyrhills, FL 33545

AutoZone #3640 / Zephyrhills
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Zephyrhills, FL 33545

General Contractor Services - Magnolia Oaks New Construction
New Construction, Infrastructure
Bidding
$12,000,000 CJ est. value
New Port Richey, FL 34653

Publix - Epperson Ranch / Wesley Chapel
New Construction, Infrastructure - 59,928 SF
Bidding
$15,800,000 CJ est. value
Wesley Chapel, FL 33545

Construction Services for District Improvements
Post-Bid
Wesley Chapel, FL

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

County Road 54 Improvements Phase II (West of Wire Road to East of 23rd Street)
Results
$5,868,671 est. value
New Port Richey, FL 34654

Intersection Improvement at CR 35A and US 98
Results
FL

Ridge Road Phase 2A /Cr 524
New Construction
Construction
Land O' Lakes, FL

Construction Services For District Improvements - Florida Site Construction
Construction
Land O Lakes, FL 33600

Zephyr Commons Apartments
New Construction, Infrastructure
Pending Verification
$94,700,000 CJ est. value
Zephyrhills, FL 33541

Zephyr Commons Apartments
New Construction, Infrastructure
Pending Verification
$94,700,000 CJ est. value
Zephyrhills, FL 33541

Epperson North Village B
Infrastructure
Design
$1,000,000 CJ est. value
Wesley Chapel, FL 33543

Ironbark Drive Neighborhood Flood Abatement Project
Infrastructure
Bidding
$50,000 CJ est. value
Bayonet Point, FL 34668

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Last Updated 09/13/2022 03:12 PM
Project Title

RFP Engineering - Suncoast Connector PD and E/Design - A

Physical Address View project details and contacts
City, State (County) Land O Lakes, FL 34639   (Pasco County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2021 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from Project Manager
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 14, 2020, public comments are being requested for this project and a task force has been created to address the community concerns raised. A final report will be submitted to the governor and the Legislature by November 15th. There is no timeline for when this project may begin construction, but is required to start by December 31, 2022. There will be no Architect chosen since it is Civil Project Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) Selection Method : Letter of Response, Technical Proposal, and Oral Presentation Professional Liability Insurance : $2,250,000.00 TRC Members (Subject to Change) : Jason Peters Ryan Asmus Will Watts It is the policy of FDOT to encourage the participation of small businesses and disadvantaged business enterprises ("DBE") in all facets of the business activities of FDOT, consistent with applicable laws and regulations. FDOT has established an aspiration goal of 10.65% DBE usage and an additional 3% non-DBE Small Business usage for the subject Project Southwest Florida PD&E/Design - A An Organizational Chart must be submitted with the Letter of Response. Organizational chart can be either 8.5x11 or 11x17, at the discretion of the Consultant. Organizational charts are not restricted on font size or margin. All other submittal requirements for Letters of Response must be adhered to. ************************************************************ Actual commitment and final execution of this contract is contingent upon approved legislative budget and availability of funds. ************************************************************ Direct all questions to the Department by emailing lindsey.ballance@dot.state.fl.us ************************************************************ TRC Members are subject to change. Special instructions for the Letter of Response for this advertisement contract, Ad No. 20266: The content of the Letter cannot go beyond Page 3 of the Professional Services Letter of Response Form No. 375-030-22. Letter content exceeding page 3 of the Form will be found non-responsive. Pages 4, 5, and 6 of the Form are reserved for the table listing prime and subconsultants by work type. The tables listed on Pages 4, 5, and 6 of the Letter of Response form may be replicated for the sole purpose of listing additional subconsultants, as needed. No other content may be added on these pages, and the Letter of Response shall not be extended for any purpose other than as described herein. Eligibility Restriction: Consultants who are primes on the M-CORES Owner's Representative contracts are precluded from competing for the PD&E Segment A contracts as a prime. The prime consultant selected as #1 ranked for the subject contract is not eligible for award of the remaining two M-CORES PD&E/Design contracts for Segment A. Fee Proposal: This contract has a compressed procurement and negotiation schedule due to the need to meet production schedules. The selected consultant must submit a fee proposal within one week of the Final Selection date. Technical Review Committee Meeting 1 Date/Time 2/18/2020 07:00 pm Shortlist Selection Date/Time 2/25/2020 07:00 pm Scope Meeting Date/Time 2/27/2020 01:30 am Technical Review Committee Meeting 2 Date/Time 3/09/2020 11:00 pm Phase II Submittal Deadline Date/Time 3/11/2020 11:30 pm Technical Review Committee Meeting 3 Date/Time 3/21/2020 01:00 am Final Selection Date/Time 4/06/2020 07:00 pm Negotiations Period Begin Date 4/10/2020 Negotiations Period Ending Date 5/09/2020 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - Suncoast Connector PD and E/Design - A

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents