Similar Projects
Oakland WWTP Sludge Thickening - 291091.00 0 - City of Topeka
Renovation
Conception
$3,598,000 est. value
Topeka, KS 66612

Wastewater Treatment Plant Solids Treatment Upgrade and Expansion Project
Addition, Demolition, Renovation, Infrastructure
Design
$10,000,000 CJ est. value
Manhattan, KS 66502

Comprehensive Disinfection Modification - 281236.00 - City of Topeka
Renovation
Design
$19,859,205 CJ est. value
Topeka, KS 66606

Ozone System Supplier: Disinfection Modifications
Renovation
Bidding
$400,000 CJ est. value
Topeka, KS 66606

RFP Design - Clinton Water Treatment Plant Chemical Storage and Distribution Improvements Consultant
Renovation
Bidding
$1,000,000 CJ est. value
Lawrence, KS 66047

Water Treatment Plant Lime Pit Sludge Removal
Term Contract
Sub-Bidding
Manhattan, KS 66502

On Call Contractor Services for Treatment Plant
Term Contract
Post-Bid
Wichita, KS

Odor and Corrosion Control Services
New Construction
Post-Bid
Wichita, KS

Defoamant - Kaw Point Treatment Plant
New Construction
Results
Kansas City, KS

Wastewater Treatment Plant Aeration Blower Replacement
Renovation
Results
Wamego, KS

Operation and Maintenance for Oakland RNG Pipeline
Renovation
Post-Bid
Topeka, KS

Turkey Creek WWTF Miscellaneous Improvements
Renovation
Results
Mission, KS 66202

SCADA System Maintenance and Integration Services
Term Contract
Post-Bid
Overland Park, KS 66224

2022 Wastewater Treatment Facility Improvements
Renovation
Results
$2,601,500 est. value
Osawatomie, KS 66064

Wastewater Treatment Plant SCADA Controls & Instrumentation Maintenance NBAF
Renovation
Post-Bid
Manhattan, KS 66506

Last Updated 08/15/2022 11:36 AM
Project Title

City of Wichita Northwest Water Facility (NWWF)

Physical Address View project details and contacts
City, State (County) Wichita, KS 67203   (Sedgwick County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected April 2022
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of the Chemical Feed Building (260) and Disinfection Building (400) at the Water Treatment Plant (NWWF) in Wichita, Kansas. As of August 15, 2022, construction is underway and nearing completion. No further inquiries to be accepted. * Please note American Iron and Steel requirements apply to this project. *This project has been awarded and all trades have been let.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents