Similar Projects
2022 Tar and Chip Project
Infrastructure
Design
$30,000 CJ est. value
Parryville, PA 18244

Ready Mixed Concrete and Cement/Concrete Products
Term Contract
Bidding

Ready Mixed Concrete and Cement/Concrete Products
Term Contract
Bidding

Garage Floor Concrete Resurfacing
Post-Bid
Milford, PA 18337

Precast Concrete Curbs
Term Contract
Post-Bid
Pittsburgh, PA

Tyrone Area High School Loading Dock Renovations Project - General Construction
Results
Less than $184,000 est. value
Tyrone, PA 16686

Concrete Restoration Services
Term Contract
Results
New Stanton, PA 15672

Bridge Repairs
Infrastructure
Bidding
$1,500,000 CJ est. value
Somerset, PA 15501

Foundations & Slab-On-Grade Bid Package at Pittsburgh International Airport
Post-Bid
Pittsburgh, PA 15233

Portland Concrete
Results
Chambersburg, PA

East Lancaster Avenue (SR 0030) Pedestrian Improvements from Barley Cone Lane to Garrett Avenue
Infrastructure
Bidding
$300,000 CJ est. value
Radnor, PA 19087

Precast Concrete Catch Basins, Risers, Grates & Frames
Post-Bid
Erie, PA 16507

North Shore Riverfront Park (NSRFP) Tribute to Children (TTC) Masonry and Concrete Repairs
Results
Pittsburgh, PA 15212

RFQ Contractor - Taxiway Y and U Rehabilitation
Infrastructure
Bidding
$5,000,000 CJ est. value
Philadelphia, PA 19153

Precast Concrete Blocks
Post-Bid
Erie, PA 16507

Last Updated 09/13/2022 05:05 PM
Project Title

SR 2011 Coburn Bridge Rehab

Physical Address View project details and contacts
City, State (County) Penn Township, PA 16832   (Centre County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The description and location of the project is as follows: For the improvement/repairs to a bridge in CENTRE COUNTY, PENN TOWNSHIP, Commonwealth of Pennsylvania, SR 2011 Section P29. For the rehabilitation of the single span pony truss bridge. Construction involves replacing floor beam bearings, replacing rivets with high strength bolts, concrete repairs, fabricated structure steel repairs, zone painting of structure steel. Work also includes jacking bridge superstructure, and miscellaneous construction for a total construction length of approximately 406 feet (0.08 miles) as indicated on the approved drawings included in the bid package. Project Cost Range: $500,000.00 - $999,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 77.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: BRIDGE PAINTING 408 Version: 2020-4 Anticipated NTP: 10/31/2022 Structure Work: 77.00% Required Completion: 07/17/2023 PADOT - SR 2011 Coburn Bridge Rehab *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents