Similar Projects
Water Plant No. 2 Expansion
Post-Bid
TX

Wastewater Treatment Plant No. 2 Phase 2
Post-Bid
TX

Modifications to Water Plant No 1
Results
Less than $2,100,000 est. value
TX

Rehabilitation of Waste Water Treatment Plant at HC BOF
Results
Houston, TX 77045

Construction of Water Plant No. 1 MCC Replacement and SCADA System
New Construction
Post-Bid
Houston, TX 77014

Construction of Proposed Chloramine Conversion to Serve Water Plants No. 1, 2, 3 and 4
Results
Houston, TX 77002

Water Plant Motor Control Center Replacement
Renovation
Post-Bid
$594,000 est. value
TX

Water Plant No. 4
Results
Less than $3,500,000 est. value
Spring, TX 77388

Water Plant Number 2 Modifications Project B
Results
Shoreacres, TX 77571

EWPP Installation of Vertical Flocculators at Plant 3
Results
Less than $18,657,760 est. value
Houston, TX 77000

Water Plant No. 1 Motor Control Center Replacement
Results
Houston, TX 77084

Surface Water Treatment Plant Solids Handling Project
Results
$4,000,000 to $4,500,000 est. value
Deer Park, TX 77536

Construction of Water Plant No. 5
Results
Houston, TX 77002

Water Plant No. 1 and 2 Chloramine Conversion
Results
TX

Manvel Town Center Water Plant
Results
Houston, TX

Last Updated 08/19/2021 07:40 AM
Project Title

Water Plant No. 1 and 2 Rehabilitation

Physical Address View project details and contacts
City, State (County) TX   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $995,600
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Water Plant No. 1 and 2 Rehabilitation including draining, cleaning, blasting and recoating of interior and exterior of existing GST No. 1 and 2 and all attendant above ground piping and fittings, and rehabilitation as shown on plans; power wash exterior of existing concrete GST No. 3 and rehabilitation as shown of the plans; rehabilitation of chlorine feed room and control building; recoating of emergency diesel generator enclosure; and site work as shown on the plans at Water Plant No. 1; Rehabilitation of GST No. 1 and 2, rehabilitation of HPT No. 1 and 2; and site work as shown on the plans at Water Plant No.2; blasting and recoating all above ground piping of Water Wells No. 1 through 7 as shown on the plans. Microsoft Teams Meeting Bid Opening Call-In Number: (832) 680-2579 Conference ID: 640 286 985#

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents