Similar Projects
Mill Creek Crossing Residential
New Construction
Conception
Concord, NC 28027

Carolina Estates f/k/a Sunrise Cove
New Construction
Conception
Sunset Beach, NC 28468

The Homeplace Of Southport
New Construction
Design
Southport, NC

Marsh Walk
New Construction
Design
Supply, NC 28462

MOTSU Firefighting Water System
New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Southport, NC 28461

Shallotte Rest Area Renovation - Readvertisement
Infrastructure
Bidding
$3,000,000 CJ est. value
Bolivia, NC 28422

R. Brown McAllister Elementary School - Concrete & Glass Package
New Construction, Infrastructure - 116,000 SF
Sub-Bidding
$37,000,000 CJ est. value
Concord, NC 28025

Installation of Long-life Pavement Markings and Rumble Strips
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Morganton, NC 28655

Home Energy Improvement Project NC Weatherization Assistance Program
Renovation
Post-Bid

Home Energy Improvement Project NC Weatherization Assistance Program
Renovation
Post-Bid

RAD Conversion Multi-Family Conversions to 6 Communities
Results
$10,000,000 to $15,000,000 est. value
Burlington, NC

Earthquake Disaster Recovery Single-Family Home Construction Project No. 41
Results
Sparta, NC 28675

Woodland Trace
New Construction
Construction
Candler, NC 28715

Caldwell County Animal Shelter
New Construction, Infrastructure
Construction
Lenoir, NC 28645

Mill Creek Crossing
New Construction - 72,000 SF
Pending Verification
$300,000,000 CJ est. value
Kannapolis, NC 28083

Last Updated 08/04/2022 03:33 AM
Project Title

Residential Recovery Program Single-Family Home Construction Project No. TS4

Physical Address View project details and contacts
City, State (County) Canton, NC 28716   (Haywood County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Purchase and Set Up of One (1) Double-Wide Manufactured Housing Unit (MHU) Within Ninety (90) Days. Bidder must email bid on or before the Bid Opening date and time, and the transmittal email should request a receipt of delivery. THE TRANSMITTAL INFORMATION SHOULD NOT CONTAINING ANY PRICING INFORMATION AND SHOULD ONLY STATE THE BIDDER'S LEGAL NAME AND OSBM-DR IFB NUMBER. The original email must be mailed so that it is received by OSBM-DR no later than five (5) days after the Bid Opening Date. All timely bids received by email will be conditionally accepted but subject to rejection if the original is not received by our office in regular mail by the close of business on the fifth day after the Opening Date. OSBM-DR's administrative assistance will forward all bids to the OSBM-DR staff responsible for the bid opening on the bid opening date and will also set up a back-up folder for the bids in a networked folder that can be accessed by OSBM-DR staff on the Opening Date. 2. Hand-Delivery BY APPOINTMENT ONLY to: Dana Phillips, Operations Manager Office of State Budget & Management-Disaster Recovery Section Dobbs Building, Suite 4002 430 N. Salisbury Street Raleigh, NC 27603 (984) 236-0738 (Office) (919) 850-1234 (Mobile-Telework Contact) OR TS Fred Intake Center 3rd Floor Haywood County Historic Courthouse 215 N Main St, Waynesville, NC 28786 To the extent bidder will use a general contractor to perform any work in setting up any on any lot, the general contractor must be properly licensed under Chapter 87, Article 1, General Statutes of North Carolina, and must have license classification for Limited, Intermediate, or Unlimited Construction. Bidder or its general contractor must use properly North Carolina licensed subcontractors for the performance of electrical, plumbing, mechanical and HVAC (heating, ventilation, and air conditioning), or as may be required by authority having jurisdiction (i.e., municipal and/or county building department. No bid bond shall be required for this IFB. Bidder shall indicate in its bid whether it is able to provide a performance bond and a payment bond for all contract it may be awarded under this solicitation. Bidder shall include a unit price for the premium for each bond. In lieu of bonds, Bidder shall provide a statement as to how it will guarantee timely performance of any contract awarded under this solicitation and how it will resolve issues with its subcontractors to avoid mechanics liens that may be placed against the home and properties for alleged nonpayment of sums that may be due under the subcontractors. Any required bond shall have a penal sum for one hundred percent (100%) of the contract price. Specifications for MHU- Brick skirting with 18" x 24" door for crawlspace (see below). All towing apparatus removed. Provide permanent steps or porch as described below. The bidder will be responsible for proper placement of the MHU on the lot in compliance.with current zoning requirements. MHU Minimum Requirements: Doublewide with a minimum square footage 900 - 1200 sf. Model must have a minimum Three (3) Bedroom. Model must have a minimum Two (2) Bathroom. Model must include living/family room, kitchen and eating area. Ceiling lights in each bedroom and in living/family room operated from wall switch. Wind Zone 2 home - rated for 100 mph (minimum 25 or 30-year shingle with corresponding warranty). Home shall have OSB exterior wall cladding (sheathing). Energy Star designation for: Windows (thermal pane insulated glass) with full screens Doors HVAC Appliances as achievable. Appliances that must be included in bid are: refrigerator; dishwasher; range (combination oven and stovetop); microwave/range hood combination or separate range hood depending on standard package for MHU model. Brick Skirting with minimum height per local authority having jurisdiction or 32 inches above grade or 24 inches above any known flood levels, whichever is higher. Drywall wall finishes, not paneling, in all living spaces. Installation of a 10-foot by 10-foot deck off of rear of MHU with steps to grade. Small 5x5 deck (wood) with stairs at front egress. No Plastic Plumbing Fixtures (sinks, faucets, etc.) ADA/Comfort Height Toilet in Master Bath. Low Threshold/Walk in Shower in Master Bathroom must be offered as an option if requested by the Homeowner. MHU must meet U.S. Department of Housing and Urban Development's specifications for manufactured homes. Vinyl sheet on entrance floors, kitchen and bath floors and carpeting in living room and bedrooms. LVP (Vinyl Plank) may be used in any room as a substitution as approved by the homeowner. Include the cost of transportation, cost of code approved set-up, costs of connecting to electrical utility, water supply and sewer, costs of all permits, taxes (if applicable), and all other work or services required to obtain a certificate of occupancy from the local authority having jurisdiction any required (e.g., an as-built survey, plat, or sitespecific engineering required by City, County, or public utility).

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents