Similar Projects
Downtown Streetscaping Phase 3 - City of Mattoon
Infrastructure
Design
$525,000 CJ est. value
Mattoon, IL 61938

Downtown Streetscaping Phase 3 - City of Mattoon
Infrastructure
Design
$525,000 CJ est. value
Mattoon, IL 61938

Cleaning and Painting 8 Bridges on I-57
Post-Bid

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Class C Patches
Results
$108,160 est. value
Mattoon, IL

Bituminous Materials
Term Contract
Results
Charleston, IL

Land of Lincoln Sports
New Construction, Infrastructure
Pending Verification
$66,000,000 CJ est. value
Mattoon, IL 61938

Bituminous Materials
Post-Bid
Ashmore, IL

18.7 Miles of Patching and a-2 Surface Treatment on Various Routes in Clay
Infrastructure
Results

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

1.3 Miles of Smart Inlay Under Overhead Structures
Infrastructure
Results

HMA Surface Removal
Infrastructure
Post-Bid
Charleston, IL

11.6 Miles of Seal Coat
Infrastructure
Results

Cleaning and Painting 3 Structures on i-57 And i-70
Infrastructure
Post-Bid

Road Resurfacing
Infrastructure
Results
$1,526,675 est. value
Charleston, IL

Last Updated 08/24/2022 12:31 AM
Project Title

Parking Area and Roadway Sealing and Striping

Physical Address View project details and contacts
City, State (County) Mattoon, IL 61938   (Coles County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $165,745 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

All interested parties are invited to attend. The Board of Trustees reserves the right to waive irregularities and reject all bids or parts of bids. Successful Bidders shall have the sole responsibility of complying with all aspects of existing Prevailing Wage Policies. Lake Land College actively promotes continuing economic development in compliance with the Business Enterprise for Minorities, Females, and Persons with Disabilities Act (30 ILCS 575) . Successful Prospective Vendors shall have the sole responsibility of complying with all aspects.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents