Similar Projects
Sunrise Park North Southern Bulkhead Replacement
Infrastructure
Bidding
$400,000 est. value
Holly Hill, FL 32117

Safety Project/Milling and Resurfacing/Traffic Signals/Drainage Improvements
Infrastructure
Bidding
$4,909,432 est. value
Daytona Beach, FL 32116

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Aluminum and Steel Drainage Pipe
Results
FL

Howes Street and Orange Avenue Watermain and Drainage Improvements
Results
Less than $1,300,000 est. value
Port Orange, FL 32127

City Island Seawall Repair
Infrastructure
Post-Bid
$1,050,000 est. value
Daytona Beach, FL 32114

Blue Springs (Bank Stabilization)
Results
Less than $850,000 est. value
FL

Woodbound Lake to Lake Charles Stormwater Outfall Improvements Phase 1
Results
DeBary, FL 32713

Drainage Repair
Infrastructure
Results
$500,000 est. value
FL

South Pine Meadow Drive Drainage System Rehabilitation
Infrastructure
Results
DeBary, FL 32713

Sunrise Park North - Northern Bulkhead Replacement
Infrastructure
Results
Less than $561,232 est. value
Holly Hill, FL 32117

LPGA Lake - 6 Weir Replacement
Infrastructure
Results
$91,500 to $118,000 est. value
Daytona Beach, FL

32 Bonita Road Drainage Improvements
Infrastructure
Results
$124,606 est. value
DeBary, FL 32713

Drainage Repair - Drainage Repair
Infrastructure
Results
$2,300,000 est. value
FL

Last Updated 05/17/2022 11:38 PM
Project Title

Hart Avenue Drainage and Water Main Improvements

Physical Address View project details and contacts
City, State (County) Edgewater, FL 32132   (Volusia County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,805,454
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of furnishing all labor, equipment, and materials for the construction of the facilities consisting of, but not limited to, the following: Drainage improvements consisting of: installation of approximately 3,300 LF new storm pipe, 34 concrete storm structures, associated utility adjustments, re-grading existing stormwater conveyances and creation of new swales. Also including demolition of an existing flood-prone house and converting the property into a stormwater pond. Storm piping consists of approximately 1,300LF of 12" to 24" diameter piping and approximately 2,000LF of 36" to 48" diameter piping. Water Main improvements consisting of: approximately 3,600LF of 6” C 900 PVC water main, 1,600LF of 2” polytube, directional drill 1,350LF of 6” Fusible PVC C-900 DR, 8 fire hydrants and adjusting utilities accordingly. Gate Valves, Tapping Sleeves, and Insertion Valves will also be installed per plans and specs.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents