Similar Projects
Last Updated | 01/25/2023 03:31 AM |
Project Title | Abatement and Demolition Services |
Physical Address | View project details and contacts |
City, State (County) | Knoxville, TN 37921 (Knox County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Middle/Senior High School, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $786,200 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Knox County desires a turnkey abatement and demolition of the old Rule High School structure. It is Knox Countys intent to remove the entire structure including foundations and basement. Demolition is to include the tearing-down of buildings and other structures on site which shall include the hauling and disposal of the demolished building materials. The final result should be a clean site, graded and filled including seed and straw, that is ready for future development. The Contractor shall coordinate all utility terminations with the Knoxville Utilities Board (KUB) and Knox County. Abatement of all hazardous materials, as necessary, is to be included. Labor, equipment, materials, supplies, and disposal services as required for the enclosure, encapsulation, and/or removal of asbestos and other hazardous materials is to be included in accordance with applicable federal, state, and local regulatory guidelines. The Asbestos Survey obtained for the property is included as Attachment F. All permits regarding abatement are the responsibility of the Contractor. The Contractor shall keep the job site premises and adjacent areas free from accumulations of waste material or rubbish at all times. At the completion of the work, Contractor shall remove, from and about the premises, including adjacent areas, all rubbish, tools and surplus materials used for work.. The Contractor is responsible for any damages to any property, County owned or otherwise, that is a result of Contractor negligence while abatement is in progress. If the Contractor fails to make repairs or replace damaged materials, as necessary, the County shall deduct the amount of any damages from the Contractors payment. Warranty periods shall not commence until Knox County inspects and formally accepts the goods and/or services. The terms, conditions and timing of acceptance shall be determined by Knox County. Knox County reserves the right to reject any or all items or services not in conformance with applicable specifications, and Contractor assumes the costs associated with such nonconformance. Acceptance of goods or services does not constitute a waiver of latent or hidden defects or defects not readily detectable by a reasonable person under the circumstances. Question Deadline 10/31/2022 at 4:30 PM ET Agencies may submit questions concerning this solicitation. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |