Similar Projects
Lead Services Line Replacement Program 2021-2022
Term Contract, Infrastructure
Bidding
Providence, RI

Installation of Water Meter Chamber
Infrastructure
Bidding
West Warwick, RI

USCG STA Castle Hill Underground Water Leak Newport, RI
Post-Bid
Newport, RI

Post-Type Fire Hydrants
Term Contract
Post-Bid
Warwick, RI

Water Distribution System Improvements Main Replacement - MR-11
Results
Less than $4,049,893 est. value
Pawtucket, RI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Brass Fittings and Valves
Term Contract
Post-Bid
Warwick, RI

Post-Type Fire Hydrants
Term Contract
Results
Warwick, RI

Water Distribution System Improvements Main Replacement Project 12
Post-Bid
Pawtucket, RI

Watermain Replacement Esmond Road and Old County Road
Results
Providence, RI

Field`s Point Actuator Replacement
Post-Bid
Providence, RI

Emergency Water Interconnect
Results
$500,000 est. value
East Providence, RI

University of Rhode Island Utility Service Contract - 3 Years
Term Contract
Post-Bid
Providence, RI

Pier 2 Water Utility Project
Results
$1,000,000 to $5,000,000 est. value
Newport, RI 02841

South End Public Water System Improvements
Infrastructure
Post-Bid
Bristol, RI 02809

Last Updated 09/23/2021 06:19 PM
Project Title

Water Main Replacement Project

Physical Address View project details and contacts
City, State (County) Westerly, RI   (Washington County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work is to perform water main replacement. Approximately 2.5miles of existing ductile iron and cast iron water main in various roads (detailed below) throughout the Town of Westerly is to be replaced with C-900 pipe. All of the valves, valve boxes, fittings, services, and hydrants will also be replaced. The Contractor shall provide all-inclusive by-pass piping for the areas specified below until the new main is disinfected, tested, and can be put into service.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents