Similar Projects
Z--Romo Beaver Meadows Visitor Center HVAC
Post-Bid
$3,000,000 to $6,000,000 est. value
Estes Park, CO

HVAC Services
Term Contract
Post-Bid
Wellington, CO 80549

Longs Peak Student Center HVAC Upgrades
Results
$300,000 to $400,000 est. value
Fort Collins, CO 80526

Building Automation/Hvac Replacement Project
Results
Fort Collins, CO 80521

Building Automation Upgrade
Post-Bid
CO

Warehouse Evaporative Coolers Install
Results
Less than $50,000 est. value
Loveland, CO 80537

Infrastructure projects at the Southwest Memorial Hospital
Post-Bid
Cortez, CO 81321

HP 22 and ERV Install at the Municipal Building
Results
Loveland, CO

Epic Center Cooling Tower and Pumps
Post-Bid
Fort Collins, CO 80525

Annual Maintenance - HVAC Services Including Repair and Maintenance
Term Contract
Results
Loveland, Milliken, Windsor, CO 80538

HVAC and Mechanical Products
Term Contract
Post-Bid

UCA Duct Insulation Replacement
Results
Fort Collins, CO

Heat Exchanger Tube Bundles
Post-Bid

Heating, Air Conditioning and Refrigeration Services
Term Contract
Results
Loveland, CO

City Hall HVAC Equipment
Post-Bid
Fort Collins, CO

Last Updated 11/05/2020 10:04 AM
Project Title

ECAO Comm Room A/C Systems Replacement

Physical Address View project details and contacts
City, State (County) Loveland, CO 80528   (Larimer County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Bureau of Reclamation’s Eastern Colorado Area Office (ECAO) is located near Flatiron Reservoir in Loveland, Colorado. The office has a communications equipment room located at the basement level of the building. The room is approximately 465 square feet and has a dedicated air conditioning (A/C) system. This room houses communications equipment critical to the operation of various power generation and water delivery facilities. The existing A/C system for the communications equipment room has failed. The purpose of this contract is to complete a full replacement of the system. The Contractor shall supply all labor, materials, transportation, supervision, tools, equipment, and expertise to complete the following: 1. Remove and properly dispose of existing A/C equipment including ducting and any other components which are not needed with the new system. 2. Furnish and install a new ductless A/C (or heat pump) system to include condensing unit, evaporator unit(s), air handler(s), line-set(s), and adjustable thermostat(s). The cooling capacity of the new system must be at least 3.5 tons (42,000 Btu/hr) and must include controls for low ambient operation (must be appropriate to operate year-round). 3. Commission and test new equipment. 4. Furnish all manuals and documentation associated with the installed equipment.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents