Similar Projects
Animal Shelter - CMU1908 - City of Sugar Land
New Construction, Infrastructure
Conception
$8,750,000 CJ est. value
Sugar Land, TX 77478

Emergency Operations Center/Public Safety Dispatch Building - CMU2301 - City of Sugar Land
New Construction, Infrastructure
Conception
$11,500,000 CJ est. value
Sugar Land, TX 77479

Orchestra Room Additions at Briscoe JHS, Foster HS, Reading JHS, George Ranch HS, Leaman JHS, and Fulshear HS
Addition, Demolition, Infrastructure - 4,400 SF
Design
$6,300,000 CJ est. value
Richmond, TX 77469

Sugar Land Regional Airport Runway 17/35 Rubber Removal and Paint Markings
Infrastructure
Design
$50,000 CJ est. value
Sugar Land, TX 77498

Austin Park Chimneystone Drainage Improvements Project
Infrastructure
Bidding
$14,200,000 CJ est. value
Sugar Land, TX 77479

Mustang Bayou Wastewater Treatment Plant Expansion and Rehabilitation Project
Addition, Demolition, New Construction, Renovation, Infrastructure
Post-Bid
$6,600,000 CJ est. value
Fresno, TX 77545

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Roadway Construction to Serve Sienna Village of Destrehan Section 1 - Internal
Infrastructure
Results
$2,506,560 CJ est. value
Missouri City, TX 77489

Construction of 0.2 MGD Sorrento Wastewater Treatment Plant
Infrastructure
Results
$3,017,300 CJ est. value
Richmond, TX 77471

Lake Olympia at Vicksburg / The Shops at Lake Olympia
New Construction, Infrastructure - 17,400 SF
Construction
$1,479,000 CJ est. value
Missouri City, TX 77489

Cullinan Park Phase Two Improvements
Infrastructure
Construction
$1,415,908 CJ est. value
Sugar Land, TX 77498

WhiteWater Express Car Wash / Richmond
New Construction, Infrastructure - 4,167 SF
Pending Verification
$1,600,000 CJ est. value
Richmond, TX 77406

Candela South Water and Wastewater Plant Facilities
New Construction, Infrastructure
Pending Verification
$300,000 CJ est. value
Richmond, TX 77469

The Shed Mixed-Use / Missouri City
New Construction, Infrastructure
Conception
$8,000,000 CJ est. value
Missouri City, TX 77459

RFQ D/B - FY22 Capital Improvement Drainage Projects: Oyster Creek Diversion Channel and Detention Facilities
Infrastructure
Design
$960,000 CJ est. value
Sugar Land, TX 77478

Last Updated 09/13/2023 07:04 AM
Project Title

Collection System Rehabilitation Project E (Package #1 - CIPP)

Physical Address View project details and contacts
City, State (County) Sugar Land, TX 77479   (Fort Bend County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,900,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Question Deadline 09/05/2023 at 5:00 PM CT Questions regarding this bid must be received on time, Questions will be submitted through electronically. The project consists of: Rehabilitation of approximately 7,100 L.F. of existing 15" thru 48" sanitary sewer by cured-in-place pipe (CIPP) lining. Television inspection (pre and post TV). Bypass pumping setup, maintenance of flows to perform CIPP work. Manhole rehabilitation (wall liner, regrout frame, and/or replacement of ring and cover). Service reconnections (by excavation or remote). Additional cleaning (mechanical cleaning) as approved by the Engineer. LOCATION OF WORK: City of Sugar Land, Fort Bend County, Texas 77479 C. Add Alternates for Composite or Ductile Iron Ring and Cover: The City will evaluate the bids and recommend award of one Add Alternate based on available budget and what is most advantageous to the City. Accepted Add Alternate will be identified in the Agreement between the Owner and Contractor. The bidders shall submit bids for the two (2) Add Alternates for replacement of ring and cover on existing manholes. The Contract duration for this project is 180 calendar days. In the event, Add Alternate No. 1 or Add Alternate No. 2 is awarded; the Contract time will remain the same and will not be increased or decreased.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents