Similar Projects
Reported | 06/02/2022 12:00 AM |
Project Title | Gensel Drive and Wackerly Road Water System Extensions |
Physical Address | View project details and contacts |
City, State (County) | Sanford, MI (Midland County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Bidding, Construction Start Expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $400,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Approximately 1,600 lineal feet of 8-inch PVC water main will be constructed along the southerly side of Gensel Road, extending from North 7 Mile Road westerly 850 lineal feet, then northerly to the cul-de-sac on Gensel Drive 750 lineal feet. The proposed water main will be connected to Water District No. 1 of Midland County's existing 12-inch AC transmission main at the North 7 Mile Road and Gensel Road intersection. The West Wackerly Road loop will be outside of the road influence, but within the south side ROW connecting to an existing 8-inch AC main in front of 255 West Wackerly Road and running approximately 2,650 lineal feet to an existing 12-inch PVC main located at the southwest corner of M-30 and West Wackerly Road. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |