Similar Projects
Full Service Elevator Maintenance
Term Contract
Post-Bid
Marion, IN 46953

Gillespie Tower Elevator Services
Term Contract
Post-Bid
Muncie, IN 47302

Launch Tube Installation Handling Equipment
Results
Crane, IN 47522

Purdue University - Northwest Campus - Hammond - Gyte West Elevator Modernization
Results
Hammond, IN 46323

Ivy Tech Columbus Main Building Replacement
New Construction, Demolition
Post-Bid
Columbus, IN

Elevator Preventative Maintenance and Repairs
Results
Less than $150,000 est. value
West Lafayette, IN 47906

Ivy Tech Elevator Modernization
Post-Bid
South Bend, IN 46601

Roofing and an Elevator
Results
Elkhart, IN

Elevator Preventative Maintenence
Term Contract
Post-Bid
$150,000 est. value
New Castle, IN 47362

BL181 Simon Hall Music Library Update Elevator Controls
Results
Bloomington, IN 47405

Elevator Maintenance and Service Agreement
Term Contract
Post-Bid
Indianapolis, IN 46208

Elevator Preventative Maintenance and Repairs
Results
$150,000 est. value
Logansport, IN 46947

Elevator Preventative Maintenance
Term Contract
Post-Bid
Indianapolis, IN 46240

HS Press Box & Mechanical - Bid Phase 3 - Roofing and Elevator
Results
Elkhart, IN 46516

Ivy Tech Elevator Replacement 2020
Post-Bid
Fort Wayne, IN 46805

Last Updated 03/30/2022 01:51 PM
Project Title

Lafayette Elevator Maintenance

Physical Address View project details and contacts
City, State (County) Lafayette, IN 47901   (Tippecanoe County)
Category(s) Single Trades
Sub-Category(s) Conveying Systems
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide “Elevator Maintenance Services” at the Halleck Federal Building at 230 N. 4th Street Lafayette, IN 47901. This project includes, but is not limited to, providing performance based elevator maintenance service to ensure the safety of the building elevators and to maintain the building assets. The contractor will provide all management, supervision, labor, materials, supplies, repair parts, tools, and shall plan, schedule, coordinate and ensure effective and economical completion of all work and services specified. All elevator equipment shall be operated and/or maintained at the highest levels of efficiency compatible with the current energy conservation requirements, nationally recognized codes, and standards, and maintained at an acceptable level, throughout the contract performance period. The Contractor shall be responsible for performing all work under this contract in accordance with all Federal, State, County, City laws and codes, and follow the more stringent of them. In addition to compliance with these laws, the Contractor shall follow all applicable standard industry practices including, but not limited to: Occupational Safety and Health Act (OSHA).

Details

Division 14 - Conveying Equipment, Operation and Maintenance of Conveying Equipment, Operation and Maintenance of Elevators.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents