Similar Projects
Union Street Dam Improvements - 168-19-CIP - City of Traverse City
Renovation, Infrastructure
Conception
$19,600,000 CJ est. value
Traverse City, MI 49684

Eighth Street- Lake Avenue to Woodmere - 882-18-CIP - City Of Traverse City
Infrastructure
Conception
$10,550,000 CJ est. value
Traverse City, MI 49684

Godfrey Hall Street Mixed-Use Development
New Construction - 115,446 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Traverse City, MI 49684

Godfrey Hall Street Mixed-Use Development
New Construction - 115,446 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Traverse City, MI 49684

2023 Madison Jefferson Reconstruction Project
Infrastructure
Bidding
$50,000 CJ est. value
Traverse City, MI 49684

2023 Madison Jefferson Reconstruction Project
Infrastructure
Bidding
$50,000 CJ est. value
Traverse City, MI 49684

Bay Area Transit Authority - Operations Center - Bid Package No. 1
New Construction, Infrastructure
Sub-Bidding
$10,000,000 CJ est. value
Traverse City, MI 49686

Pre Qualified Maintenance - Cold Water Welcome Center-HMA-I-69
Infrastructure
Post-Bid

Keystone/River Road Roundabout Construction
Alteration
Post-Bid
Traverse City, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

M-72 Curb and Spillway
Term Contract
Results
Traverse City, MI

Bayview Apartments
New Construction
Construction
Traverse City, MI 49686

West Fourteenth Street: Mixed-Use Development
Renovation
Pending Verification
Traverse City, MI 49684

West Fourteenth Street: Mixed-Use Development
Renovation
Pending Verification
Traverse City, MI 49684

Walmart Supercenter #4243-277 - Smart Bundle
Renovation - 203,864 SF
Design

Last Updated 12/06/2022 01:48 PM
Project Title

Hall Street Apartment Complex

Physical Address View project details and contacts
City, State (County) Traverse City, MI 49684   (Grand Traverse County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Park/Playground, Parking Garage, Paving/Reconstruction, Retail, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $29,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 2022, project is in for redesign. A firm construction timeline has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

5 Stories Above Grade, New Construction, New Construction. 3 Stories Above Grade, Parking Spaces, 81 Parking Spaces. 1 Story Above Grade, 2,100 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Loading Dock Equipment, Residential Equipment, Residential Appliances, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Selective Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents