Similar Projects
Fourche Creek Water Reclamation Facility Digester Flare Improvements
Renovation, Infrastructure
Bidding
$300,000 CJ est. value
Little Rock, AR 72206

South Waste Water Treatment Plant Rehabilitation
Renovation
Bidding
$3,000,000 CJ est. value
Atkins, AR 72823

Heber Springs Water and Sewer – WWTP Improvements
New Construction
Post-Bid
$7,000,000 est. value
Heber Springs, AR 72543

Wastewater System Improvements - Contract Section I (Collection System)
New Construction, Infrastructure
Post-Bid
Alpena, AR

Fourche Creek Water Reclamation Facility Fog Receiving Station and Digester Upgrades
Renovation
Results
Little Rock, AR 72206

North WWTP Levee Rehabilation
Renovation
Results
Atkins, AR

RFQ - Engineering and Surveying Services
Term Contract
Bidding
Heber Springs, AR 72543

Wastewater System Improvements - Contract Section II (Wastewater Treatment Facility)
New Construction, Infrastructure
Post-Bid
Alpena, AR

Architectural Services
Infrastructure
Results
McCrory, AR

Faulkner Lake Clarifier Launder Cover Project
Renovation
Post-Bid
North Little Rock, AR

Construction of the Proposed Wastewater Treatment Facility Improvements
Renovation
Results
$2,520,000 est. value
Flippin, AR

Lost Bridge Village Treatment Facilities Improvements
New Construction
Post-Bid
$2,000,000 est. value
Garfield, AR

Hazen WWTP UV Replacement
Renovation
Results
Hazen, AR

Wastewater Rehabilitation Project
Renovation
Post-Bid
Heber Springs, AR

Emerson Wastewater Treatment Project
Renovation
Results
Emerson, AR

Last Updated 08/02/2022 08:38 AM
Project Title

South WWTP Rehab

Physical Address View project details and contacts
City, State (County) Atkins, AR 72823   (Pope County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,087,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT: South WWTP Rehab MCE Project No.: 20-8108 McClelland Consulting Engineers, Inc. 2120 Waldron Rd., Building, A, Suite 5 Fort Smith, Arkansas 72903 Phone: (479) 434-5333 The City of Atkins will receive sealed bids for the construction of the South WWTP Rehab project. The project consists of the removal and replacement of an existing clarifier mechanism, painting of the mechanism, miscellaneous steel and catwalks, general rehab to the clarifier concrete structure and items of work to allow the bypassing of the clarifier during rehab. Bids shall be on a unit price basis. The City of Atkins reserves the right to reject any and all bids received. These documents may be downloaded by selecting this project from the Current Bids link, and by entering Quest Project Number 8258680 on the Browse Projects page. For assistance and free membership registration, contact Quest- CDN at (952) 233-1632 or info@questcdn.com. Addendums to the bid package will be issued through the online MCE Plan Holders List; therefore, all prime bidders shall be responsible for downloading the bid documents from the MCE online plan room in order to be included in the Plan Holders List and submit a bid. Bidders must enter the addenda numbers in the Proposal to verify receipt. Each Bid must be submitted on the prescribed form and accompanied by a certified check or bid bond executed on the prescribed form, payable to the City of Atkins in an amount not less than 5 percent of the amount bid. For information concerning the proposed work, contact Andy Dibble, P.E, at the Engineer's office. Phone: 479-434-5333. The attention of the Bidder is directed to the applicable federal and state requirements and conditions of employment to be observed and minimum wage rates to be paid under this Contract. Pursuant to Arkansas Code Annotated 22-9-203 the City of Atkins encourages all qualified small, minority and women business enterprises to bid on and receive contracts for goods, services, and construction. Also, the City of Atkins encourages all general contractors to subcontract portions of their contract to qualified small, minority, and women business enterprises. The Owner reserves the right to waive irregularities. As set forth in ACA 14-58-303, the Mayor or the Mayors authorized representative shall have exclusive power to award the bid to the lowest responsible bidder, but may reject any and all bids. The Owner may postpone the award of the Contract for a period of time which shall not exceed beyond 60 calendar days from the bid opening date.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents