Similar Projects
Latino Cultural Center - AR00000005 - City of Phoenix
New Construction, Renovation, Infrastructure
Conception
$902,484 CJ est. value
Phoenix, AZ 85004

Central and Thomas High Rise
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
Phoenix, AZ 85012

AutoZone #3000 / Phoenix
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Phoenix, AZ 85254

Citywide Meter Vault Improvements Phase IV
Bidding
$162,733 est. value
Glendale, AZ

RFP - Development of P83 Central Business District
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Peoria, AZ 85345

RFQ Construction Manager at Risk - Site 20 New Reservoir Construction
Infrastructure
Post-Bid
$13,700,000 CJ est. value
Gilbert, AZ 85297

Research on the Impact of Diamond Grind Pavement Resurfacing on PM-10 Emissions
Term Contract
Post-Bid
AZ

Pinnacle Peak Road 45th Avenue to 35th Avenue Paving and Storm Drain Improvements
Results
$9,000,722 est. value
Glendale, AZ 85310

Lehi Crossing Shared Use Pathway - Phase 1
Results
Mesa, AZ

5290 East Exeter Subdivision
New Construction
Construction
Phoenix, AZ 85018

Bungalows on Westgate - Glendale
New Construction, Infrastructure
Construction
Glendale, AZ 85305

Laveen Spectrum
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Phoenix, AZ 85041

Greenbelt 88 - Lucky Plaza
New Construction, Infrastructure - 22,000 SF
Pending Verification
$115,000,000 CJ est. value
Scottsdale, AZ 85251

RFQ D/B - Design-build Manager for Water Campus Administration Building Expansion and New Lab
Addition, Demolition, New Construction, Infrastructure
Design
$13,000,000 CJ est. value
Scottsdale, AZ 85251

Festival Ranch Planning Area 2 Kerry Lane Infrastructure Water Line and Offsite Water Line
Post-Bid
Buckeye, AZ

Last Updated 08/23/2022 02:31 PM
Project Title

Norma and Johnny Streets Improvement Project

Physical Address View project details and contacts
City, State (County) Gila Bend, AZ 85337   (Maricopa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $586,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of July 29, 2022, this project has not yet been awarded. The project is expected to be awarded on August 9, 2022. This federally funded project consists of the improvement of Norma Street from Dodson Street to Johnny Street and Johnny Street from Papago Street to Norma Street, for a total length of approximately 2000 feet. The major items of work include the following construction items 1. Asphalt Street Paving - 3" asphalt concrete on 8" aggregate base 2. Concrete Sidewalk (5' Wide) 3. Concrete Sidewalk Curb Ramps 4. Concrete Valley Gutter and Aprons 5. Asphalt Pavement Removal 6. Subgrade Preparation 7. Adjust Existing Manholes and Valves 8. Miscellaneous Grading & Drainage Work And any and all other associated contingent and miscellaneous items of work to complete the proposed improvements to provide two new paved street segments in the Town of Gila Bend. The contractor shall furnish all materials, labor, equipment, services, transportation, and perform all the work for the project known as the Norma and Johnny Street Improvements Project for the Town of Gila Bend, Arizona, as called for in the Technical Specifications and on the Plans (Drawings). The proposer should prepare and provide a detailed time schedule for completion. To be considered, one (1) original and two (2) copies of the bid proposal must be provided and completed in accordance with the Instructions to Bidders included in this bid package. Bids received after the specified time of closing will be returned unopened. The Town of Gila Bend also reserves the right to hold any or all bids for a period of ninety (90) days after the date of opening. Bidders will not be allowed to withdraw submitted bids during the ninety (90) day period Said bid security shall be considered liquidated damages and shall be forfeited to the Town of Gila Bend in the event the proposal is accepted and the successful bidder fails to execute the contract and furnish the required bonds within ten (10) working days after the notice of bid award. The Town of Gila Bend reserves the right to accept the lowest, responsible bid; to consider alternatives; to reject any or all bids; and to waive irregularities of information in any bid.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents