Similar Projects
Boorn Brook Farm Eco Resort
New Construction, Infrastructure
Design
$11,500,000 CJ est. value
Manchester Center, VT 05255

BennHi Redevelopment
Demolition, New Construction, Infrastructure - 100,000 SF
Design
$10,000,000 CJ est. value
Bennington, VT 05201

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ Engineering - Wastewater Projects
Infrastructure
Post-Bid
$210,000 CJ est. value
Arlington, VT 05250

RFQ Engineering - Wastewater Projects
Infrastructure
Post-Bid
$210,000 CJ est. value
Arlington, VT 05250

The Rowland Project
New Construction - 2,500 SF
Construction
$20,000,000 est. value
Manchester Village, VT 05254

Manchester Elementary & Middle School Outdoor Classroom - Manchester Elementary Middle School
Infrastructure
Pending Verification
$50,000 CJ est. value
Manchester Center, VT 05255

Orchard Apartments
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Bennington, VT 05201

Army National Guard Readiness Center - State of Vermont Army National Guard
LEED Certification, New Construction, Infrastructure
Design
$2,000,000 CJ est. value
Bennington, VT 05201

Front-Line Rearing Ponds Improvements
Infrastructure
Post-Bid
$781,115 CJ est. value
Bennington, VT 05201

County Street Sewer Upgrades
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Bennington, VT 05201

Main Street Sewer Main Extension - Phase 1
Infrastructure
Post-Bid
$300,000 CJ est. value
Manchester Center, VT 05255

Phase 1 Rearing Ponds Improvements
Infrastructure
Post-Bid
Bennington, VT 05201

Last Updated 02/13/2023 10:24 AM
Project Title

Service Line Replacement

Physical Address View project details and contacts
City, State (County) Dorset, VT 05250   (Bennington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $3,549,150 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of February 13,2023 this project has not yet been awarded. A timeline for award is anticipated within the next month. ** The Project consists of approximately 18,500 feet of water service pipe and appurtenances for existing water customers in Dorset, including new meters and shared small diameter mains. Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, as indicated in the Bid Schedule. Checks for Bidding Documents shall be payable to Otter Creek Engineering, Inc. mailing address: P.O. Box 712, East Middlebury, VT 05740. Upon request and receipt of the document payment indicated above. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the Bidders date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Neither Owner nor Engineer will be responsible for issuing Addenda if any, to parties obtaining Bidding Documents from sources other than the Issuing Office. Electronic copies of Bidding Drawings and Documents are available as portable document format (PDF) files upon request to all parties recorded as having officially received the Bidding Documents from the Issuing Office. Attendees are expected to comply with current State of Vermont guidance regarding the Executive Order No. 01 20, Declaration of State of Emergency in Response to COVID 19. Contact the Issuing Office if you prefer to attend the meeting remotely using a web conference link. This project is funded in part through the Vermont Drinking Water State Revolving Fund (DWSRF). Consequently, the following provisions apply to this WORK (more detail for each of these provisions can be found in the Instructions to Bidders): 1. Disadvantaged Business Enterprise (DBE) requirements 2. Performance BOND and Payment BOND each in the amount of 100% of the contract price 3. AIS (American Iron and Steel) provisions of P.L. 113 76, Consolidated Appropriations Act 4. Federal Wage Rates as determined under the Davis Bacon Act Bid security shall be furnished in accordance with the Instructions to Bidders.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents