Similar Projects
Cameron Park Drive Widening - Palmer Drive to Sudbury - 72143 - El Dorado County
Alteration
Conception
$6,047,000 est. value
Cameron Park, CA 95682

US 50 / Latrobe Road / El Dorado Hills Boulevard Interchange Improvements Phase 2B - 36104001 - El Dorado County
Infrastructure
Conception
$7,620,000 CJ est. value
Placerville, CA 95667

Multifamily Construction
Infrastructure, Renovation
Design
South Lake Tahoe, CA 96150

Multifamily Construction
Infrastructure, Renovation
Design
South Lake Tahoe, CA 96150

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

As-Needed Road Surface Treatment Services
Infrastructure
Post-Bid
CA

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

2022 Road Work Project
Infrastructure
Results
$250,000 est. value
CA

Motherlode Forcemain Replacement Program - El Dorado Irrigation District
Renovation, Infrastructure
Construction
$15,000,000 CJ est. value
Placerville, CA 95667

Motherlode Forcemain Replacement Program - El Dorado Irrigation District
Renovation, Infrastructure
Construction
$15,000,000 CJ est. value
Placerville, CA 95667

Ponte Palermo Phase 2
New Construction, Infrastructure - 115,650 SF
Pending Verification
$23,200,000 CJ est. value
Cameron Park, CA 95682

Ponte Palermo Phase 2
New Construction, Infrastructure - 115,650 SF
Pending Verification
$23,200,000 CJ est. value
Cameron Park, CA 95682

Ice House Road Pavement Rehabilitation - Phase 3 - 36105068 - El Dorado County
Infrastructure
Conception
$2,533,000 CJ est. value
Kyburz, CA 95720

SpringHill Suites / Placerville
New Construction, Infrastructure
Design
$28,000,000 CJ est. value
Placerville, CA 95667

Auburn Lake Trails Paving Projects
Infrastructure
Post-Bid
$2,000,000 est. value
Cool, CA 95614

Last Updated 08/19/2023 06:03 AM
Project Title

GAOA Dru Barner Campground Improvements

Physical Address View project details and contacts
City, State (County) Georgetown, CA 95634   (El Dorado County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

127EAW23R0057 - GAOA Dru Barner CG Improvements El Dorado National Forest FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $250,000 and $500,000 Set Aside: Total Small Business Set Aside IMPORTANT NOTES: See Section L, Paragraph L.2 for the Documents to Submit with Your Proposal All Requests for Information (RFI's) shall be submitted to the Contracting Officer, Greg Cunningham, on the attached RFI form not later than 1300 hours PST, August 16th, 2022. A FS organized pre-proposal site visit will NOT be held. The project locations are open to the public and can be viewed by each prospective offeror. In no event shall failure to inspect the site constitute grounds for a claim after contract award. C.1 SCOPE OF CONTRACT: The Eldorado National Forest proposes improvements to the Dru Barner Campground water system and access road. This project will replace the submersible pump in the vertical groundwater well at Dru Barner Campground, install a pole-mounted solar panel power system, install a security fence around the solar panels, clean the well, install power and control wiring, and install a water meter, iron filter system, booster pump, hydropneumatic tank, check valve, and a prefabricated building. Road improvements include roadbed reconditioning of the main loop road, placement of aggregate base in select areas, construction of rolling dip and rocked swale. Contractor shall furnish all material, labor, equipment, documentation, communication, notifications, and transportation as required to furnish and install the improvements described herein, as shown on the Project Plans, and as otherwise required by the Contract. All demolition, disposal, construction, and improvements described herein and as shown on the Project Plans are the responsibility of the Contractor. See attachment "1. Statement of Work" for further details. C.2 PROJECT LOCATON The Dru Barner Campground is located roughly 7 miles from Georgetown, California at 38_56'31" N, 120_45'57" W and an elevation of 3339 feet. From Georgetown drive northeast for 6 miles on Main Street/Wentworth Springs Road. Take a left on Bottle Hill Bypass Road, travel 1 mile, and then a left on Bottle Hill Road. Continue approximately 0.3 miles. The entrance to Dru Barner Campground is on the left. C.3 ESTIMATED START DATE / PERIOD OF PERFORMANCE (PoP) The estimated start date for this project is September 25th, 2023 with a 70 calendar day period of performance (PoP) after issuance of Notice to Proceed (NTP). C.4 MAGNITUDE OF CONSTRUCTION PROJECT FAR 32.204 - Disclosure of Magnitude of the Construction Project: Between $250,000 and $500,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents