Similar Projects
Construction of the Stone Child College Extension Building Project
Infrastructure
Post-Bid
$1,000,000 est. value
Box Elder, MT 59521

Stone Child College Daycare Sewer Project
Infrastructure
Post-Bid
$270,000 est. value
Box Elder, MT 59521

Lake McDonald Utility Relocation
Infrastructure
Results
$15,000,000 to $20,000,000 est. value
Kalispell, MT

Lone Peak High School - Phase 2 Addition And Renovation - Bid Package #2
Renovation, Term Contract, Infrastructure, Alteration
Post-Bid
Gallatin Gateway, MT

Groundwater Wells
Infrastructure
Results
$277,200 est. value
Helena, MT 59602

Edna Mountain Returns Piling and Scarification
Infrastructure
Results
$485,000 est. value
Helena, MT

Montana Tech Ground Water Investigation Program (GWIP)-Eureka Drilling
Infrastructure
Post-Bid
$300,000 est. value
Helena, MT

GNA Spread Thick Piling Project
Infrastructure
Bidding
$200,000 est. value
Helena, MT

Montana Museum of Arts Culture Building Site Work Project
Infrastructure
Post-Bid
Missoula, MT 59812

Park Restroom
Renovation, Infrastructure
Post-Bid
Roundup, MT 59072

Asrwss Fort Peck West Branchlines Project; Phase 2, Phase 3 And Phase 4
Alteration
Results
Poplar, MT 59255

Skookum Tornilla Pile and Scarify
Term Contract
Results
Thompson Falls, MT

Pompeys Pillar National Monument Stabilization
Infrastructure
Design
$1,000,000 to $5,000,000 est. value
Pompeys Pillar, MT

Last Updated 07/06/2022 08:00 AM
Project Title

Repair Vehicle Ground Points at Launch Facilities

Physical Address View project details and contacts
City, State (County) MT   (Cascade County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Launch facilities in the 10th, 12th, and 490th Missile Squadron complexes. Work will consist of complete excavation for new conductor and preparing the foundation for the cast-in-place concrete block at each LF, new grounding points and abandoning of the old grounding point, installing new cable, backfill/compaction of trench, and perform resistance testing of new cable and ground points. The Contractor shall provide all plant, labor, equipment, supervision, services, and materials to execute and satisfy the requirements of this contract.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents