Similar Projects
Grade, Draining, Bridge and Surface
Infrastructure, Renovation
Design
$11,956,571 CJ est. value
Sallisaw, OK 74955

Grade, Draining, Bridge and Surface
Infrastructure, Renovation
Design
$11,956,571 CJ est. value
Sallisaw, OK 74955

FY22 Rehab and Paint Tainter Gates Tenkiller Lake
Infrastructure
Bidding
$5,000,000 CJ est. value
Gore, OK 74435

National Cherokee Nation Park - Phase I Site Infrastructure Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Muldrow, OK 74948

Vian Public School New High School Project
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Vian, OK 74962

Slabjacking and Subsealing Services
Infrastructure
Results

Blackgum Landing Road
Term Contract
Results
Cookson, Roland, OK

Webbers Falls Lock and Dam (#16) and Reservoir Tainter Gate Rehabilitation: Gates 6, 7, 8, 9, 10 & 11
Infrastructure
Design
$25,000,000 CJ est. value
Gore, OK 74435

Construction of 4-inch HDPE Pipeline
Infrastructure
Post-Bid
$100,000 CJ est. value
Gore, OK 74435

I-40/I-40 RAMP/US-59/US-64 - Bridge Water Proof Seal
New Construction, Infrastructure
Results
OK

Bridge and Approaches - SH 101
Infrastructure
Design
$2,745,426 CJ est. value
Sallisaw, OK 74955

Belfonte Site Preparation
Infrastructure
Post-Bid
$100,000 CJ est. value
Muldrow, OK 74948

Pavement Rehabilitation (P.C. Concrete) US-64
Infrastructure
Results
OK

Grade, Drain and Surface - SH 82
Infrastructure
Design
$11,990,000 CJ est. value
Vian, OK 74962

Marble City Community Center
New Construction, Infrastructure
Post-Bid
$9,500,000 CJ est. value
Marble City, OK 74945

Last Updated 02/14/2023 03:33 AM
Project Title

Bridge and Approaches - SH 82

Physical Address View project details and contacts
City, State (County) Vian, OK 74962   (Sequoyah County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $3,069,010 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sh-82: Over Snake Creek, 11.1 Miles North of Us-64 Jct. As of February 14, 2023, the project is in Design status. Anticipated letting month/year is July, 2024. Length : 0.400 Mi OKDOT - Bridge and Approaches - SH 82 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents