Similar Projects
Sewer Reconstruction and Sewer Lining
Bidding
$2,000,000 to $3,000,000 est. value
Philadelphia, PA

2021 ALCOSAN Regionalization Sewer Repairs
Bidding
Less than $400,000 est. value
Pittsburgh, PA

Penn Hills 2019 CCTV Inspection Contracts - Contract B
Post-Bid
Pittsburgh, PA 15123

Penn Hills 2020 CCTV Inspection Contracts
Post-Bid
Penn Hills, PA 15235

Sanitary Sewer Lining
Results
$175,000 est. value
Sharon Hill, PA 19079

Sanitary and Storm Water Cipp Project
Results
Lock Haven, PA 17745

Catch Basin Cleaning
Bidding
Pittsburgh, PA

Upper Street Clair 2020 Spot Lining and Manhole Rehabilitation Contract
Post-Bid
Upper St Clair, PA 15241

Concrete Catch Basins
Results
PA

Sanitary Sewer Main Cured In Place Pipe Liner
Bidding
$394,818 est. value
Yardley, PA

Lime Hollow Sanitary Sewer Upsizing Phase II
Post-Bid
Penn Hills, PA 15235

Worcester Drive Sewer Realignment
Results
Carnegie, PA 15106

Sewer Lateral Replacement at Central Bucks High School West
Bidding
Doylestown, PA 18901

Contract 3/2020 Franklin Township Municipal Sanitary Authority
Post-Bid
Murrysville, PA 15668

Shadowlawn Sanitary Sewer HDD Installation
Results
Less than $200,000 est. value
Pittsburgh, PA

Last Updated 05/06/2021 02:06 PM
Project Title

Sanitary Sewer Lining Project

Physical Address View project details and contacts
City, State (County) Bonneauville, PA   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of this section includes, but is not limited to: 1. Provide all materials, equipment, labor and incidentals for the installation and testing of cured-in-place pipe lining (CIPPL) within the sewer main. 2. The sewer main CIPPL process shall consist of inserting a resin-impregnated flexible tube into an existing sewer, expanding the tube out against the sewer pipe, and curing the tube to form a pipe liner. Curing shall be accomplished by circulating heated water, air, and/or steam to obtain the desired cure throughout the tube extending the full length from manhole to manhole. 3. The CIPPL shall cure into a hard, impermeable liner of the specified thickness and form a structurally sound liner pipe with a uniformly smooth interior.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents