Similar Projects
Asia Pacific Cultural Center Expansion
Addition, Infrastructure - 10,000 SF
Conception
$9,800,000 est. value
Tacoma, WA 98409

The Firs At Talus
New Construction, Infrastructure
Conception
Issaquah, WA 98027

Utility Tree Trimming
Term Contract, Alteration
Post-Bid
Vancouver, WA

Engineering Services for McSorley Creek Shoreline & Estuary Restoration Project
Renovation, Alteration
Post-Bid
$950,000 est. value
Des Moines, WA 98198

Stratford Lane Step to Gravity Conversion
Infrastructure, Alteration
Results
$220,878 est. value
Olympia, WA

2021-2022 Master Planning: Beaton Hill Park And Big Rock Park South
New Construction, Infrastructure
Results
$275,000 est. value
Sammamish, WA 98074

WDFW - Roses Lake Access Redevelopment Phase Two Rebid - Manson
Infrastructure
Post-Bid
$186,400 est. value
Manson, WA 98831

Rotary Morrow Park - Phase 1
Renovation, Infrastructure, Alteration
Results
$96,406 est. value
Poulsbo, WA 98370

Auburn Station Sight Line Improvement Landscape Renovation
Infrastructure
Post-Bid
Auburn, WA

2442 WLSP Sinkhole Lake Restoration
Infrastructure
Results
$276,650 est. value
Bellevue, WA 98008

On-Call Street Sweeping Waste and Vactor Waste Transport and Disposal Services
Term Contract
Post-Bid
Olympia, WA

Ostrich Bay Creek Stormwater Treatment
Infrastructure, Alteration
Results
$1,000,000 to $1,300,000 est. value
Bremerton, WA

Snow Plowing 2021-2022
Term Contract
Post-Bid
Colville, WA

Old Highway 12 Improvements
Infrastructure
Results
$140,000 to $180,000 est. value
WA

2022 -2024 Landscape Maintenance Facilities
Term Contract, Infrastructure
Post-Bid
Snoqualmie, WA

Last Updated 03/24/2022 09:26 AM
Project Title

SWR Circuits Transmission and Distribution Line Clearance

Physical Address View project details and contacts
City, State (County) Arlington, WA 98223   (Snohomish County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping, Maintenance
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $244,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: This prequalified work consists of providing all labor, materials, and equipment necessary to prune, cut, treat, remove, clear, and dispose of trees and brush, as well as perform reseeding work, under and along the District’s transmission and/or distribution system. Total distance to be covered is approximately 18.3 pole miles. Work is located in the vicinity of Arlington and Marysville, Snohomish County, Washington.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents