Similar Projects
Sanitary and Combined Sewer Main Relay
Infrastructure
Bidding
Milwaukee, WI 53211

Blanchard Street Parking Lot Developer RFP
Post-Bid
Wauwatosa, WI 53213

On-Call Construction Services for Sewer Repair and Rehabilitation
Term Contract
Post-Bid
Milwaukee, WI

Sanitary and Storm Relays
Results
West Allis, WI 53214

2020 Brown Deer Mainline Sanitary Sewer CIPP Lining
Results
Less than $662,000 est. value
Milwaukee, WI 53223

Combined Sewer Overflow (CSO) 195 Relocation
Renovation
Post-Bid
Milwaukee, WI

Sanitary Sewer Main Relay
Renovation
Results
$359,000 est. value
Milwaukee, WI

DPW Sewer and Water Mains
Post-Bid
Milwaukee, WI 53288

Sanitary Sewer Connection Liners
Results
Less than $174,625 est. value
West Allis, WI 53214

Sewer Construction
Post-Bid
Milwaukee, WI

Access Hatch Replacement Phase 6
Results
Milwaukee, WI

Combined Sewer Main Relay & Combined Sewer Lining and Manhole Repair & Lining
Post-Bid
Milwaukee, WI

CSO 102 Rehabilitation - Humboldt
Results
Milwaukee, WI

DC0101 Gate Replacements
Post-Bid
Milwaukee, WI 53221

2020 Sanitary Sewer Rehabilitation at Multiple Locations - Clean and CCTV Sewer Lines
Results
Milwaukee, WI

Last Updated 09/15/2021 03:32 PM
Project Title

Edgewood Avenue Near Surface Collector Extension

Physical Address View project details and contacts
City, State (County) Milwaukee, WI   (Milwaukee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project contemplated consists of microtunneling and open cut installation of a 72-inch diameter sewer, construction of large diversion structures, connection to existing structures, and associated elements. To support this work, the project also includes flow control and flow diversion, traffic control and protection, access site preparation and restoration, excavation, tree protection, landscaping, excavation support, management and disposal of any water collected in excavations, utility relocations, and restoration of areas impacted by the performance of the work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents