Similar Projects
High Performance Cold Mix
Infrastructure
Post-Bid

Construction of the Hope Upland WMA Metal Building
New Construction, Infrastructure
Post-Bid
$160,000 CJ est. value
Hope, AR 71801

Hope 6th St. Reconstruction
Infrastructure
Results
Hope, AR

Fulton and Patmos Overlay and Surfacing
Infrastructure
Results
Fulton, Patmos, AR

Murphy Oil #6673/7839 / Hope
New Construction, Infrastructure - 1,300 SF
Construction
$2,000,000 CJ est. value
Hope, AR 71801

Resurface CDL Driving Range
Infrastructure
Post-Bid
$134,000 CJ est. value
Hope, AR 71801

Antoine and Blevins Overlay
Infrastructure
Results
Antoine, Blevins, AR

Hwy. 332 - Washington (S)
Infrastructure
Post-Bid
$3,000,000 CJ est. value
Ozan, AR 71855

Mccaskill and Murfreesboro Overlay and Surfacing (S)
Infrastructure
Results
$400,000 est. value

Blevins - Prescott (S)
Infrastructure
Results

Polymer Resin for Polymer Overlay
Term Contract
Results

Howard Co. Line - Blevins (S)
Infrastructure
Results
$4,000,000 est. value
McCaskill, AR

Water Rehabilitation Project
Infrastructure
Results
$355,539 CJ est. value
Perrytown, AR 71801

Runway 16-34 Rehabilitation
Infrastructure
Results
$177,437 CJ est. value
Hope, AR 71801

Last Updated 04/26/2023 02:35 AM
Project Title

RSA Improvements - Phase 1

Physical Address View project details and contacts
City, State (County) Hope, AR 71801   (Hempstead County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,160,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of replacing failed drainage infrastructure, grading, removing and replacing runway pavement and runway edge lighting. Est. Value Notes: $950,000 to $1,160,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents