Similar Projects
Shiocton - Seymour Const / Resur
Infrastructure
Conception
$8,000,000 CJ est. value
Black Creek, WI 54106

Shiocton - Seymour Const / Resur
Infrastructure
Conception
$8,000,000 CJ est. value
Black Creek, WI 54106

Telulah Park Pavilion Alterations - 2022
Infrastructure
Bidding
$50,000 CJ est. value
Appleton, WI 54915

Telulah Park Pavilion Renovation
Renovation, Infrastructure
Bidding
$400,000 est. value
Appleton, WI 54915

Maple Edge Park & Patriot Park Sports Courts
Post-Bid
$160,000 est. value
Appleton, Little Chute, WI 54913

Hot Mix Asphalt Paving Program
Post-Bid
Grand Chute, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Bread Creek Village Roadway
New Construction
Results
WI 54155

Stephensville - Shiocton Const / Resurf
Infrastructure
Conception
$3,000,000 CJ est. value
Hortonville, WI 54944

Production of Asphaltic Concrete Materials Local Road Improvement Program - TRI Project Isaar Road (Pearl Road - CTH G)
Infrastructure
Bidding
$758,000 CJ est. value
Seymour, WI 54165

2021 Road Maintenance
Post-Bid
Medina, WI

Asphalt Pavement Maintenance
Term Contract
Results
Appleton, WI

RFQ Design - 911 Communication Center Building
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Appleton, WI 54911

New Trail Minor Block Retaining Wall Miscellaneous Grading and Riprapping Restoration
Alteration
Post-Bid
WI

Greenwood Road Roadway Reconstruction
Results
Greenville, WI

Last Updated 07/22/2022 09:34 AM
Project Title

RFP Engineering - Modernization - Intersection improvement

Physical Address View project details and contacts
City, State (County) Appleton, WI 54911   (Outagamie County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The intersections will be modified to improve roadway operations. Intersection improvement modernization with investigation of multiple alternatives at the WIS 47 intersection with County S in the town of Center in Outagamie County. Alternatives include a 4-way stop or single-lane roundabout. Anticipated Construction Cost: $1,000,000-$1,999,999 Advertised Fixed Fee %: 7.25 DBE goal on project: No The fixed fee for this contract will apply an indirect cost factor of 150% to the consultants estimated direct labor, regardless of the consultants actual indirect rate. Interviews will not be conducted The method of contractor selection has not been determined at this time. Wis DOT - RFP Engineering - Modernization - intersection improvement *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents