Similar Projects
Deaerator Replacement Heating Plantoakhill Correctional Institution
Renovation
Sub-Bidding
$500,000 CJ est. value
Oregon, WI 53575

Lakeside Boiler Replacement Cottage A - Mendota Mental Health Institute
Renovation
Sub-Bidding
$243,500 CJ est. value
Madison, WI 53704

Clarity Endcap Buildout
Renovation, Alteration
Post-Bid
Verona, WI 53593

NWHC Replacement of Air Handling Unit - FS-06
Term Contract
Post-Bid
$250,000 to $500,000 est. value
Madison, WI

HVAC Annual Preventative Maintenance
Results
Madison, WI 53704

Portable Water Chiller
Term Contract
Results
Madison, WI 53726

Air Compressor #3 Replacement - Walnut Street Heating Plant
Infrastructure
Construction
$87,597 CJ est. value
Madison, WI 53715

Fitchburg Community Center Boiler Replacements
Renovation
Sub-Bidding
$500,000 CJ est. value
Fitchburg, WI 53711

Duct Cleaning Services
Alteration
Post-Bid
Chippewa Falls, Madison, Mauston, Oshkosh, Union Grove, WI 54901

Building One And Four Air Conditioning Installation GPC
Infrastructure, Alteration
Results
$1,247,800 est. value
Madison, WI 53704

Refurbish Marley Cooling Tower
Alteration
Post-Bid
Madison, WI 53704

HVAC Replacement
Alteration
Results
$931,000 est. value
Madison, WI 53704

Valve Boxes
Term Contract
Post-Bid
Madison, WI

Ventilation Repairs
Alteration
Results
$210,000 est. value
Madison, WI 53705

Air Filtration Installation
Alteration
Post-Bid
$133,000 est. value
Sun Prairie, WI

Last Updated 01/25/2023 12:05 AM
Project Title

Boiler Replacement - MEP

Physical Address View project details and contacts
City, State (County) Madison, WI 53715   (Dane County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $233,621 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts 33 with the successful MEP bidders. PDF scanned file of all required bid documents, including bid and bid bond forms with original wet signatures or properly transmitted electronic signatures (only PDF files will be accepted) emailed to doadfdmbidsubmission@wisconsin.gov (this is the preferred method); In general, the work consists of the replacement of existing boilers, pumps, and associated trim in the Greenhouse. Tie new boilers into the adjacent Horticultural Lab boiler system loop and abandon that existing boiler in place. Electrical work as required to support the mechanical work. Base Bids will be received as a single lump sum bid for: 4) Mechanical (Heating, Ventilating, Air Conditioning); and 5) Electrical. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Bid Result HVAC - Belonger Corporation, Inc - 196,000 Electrical - Forward Electric, Inc. - 37,621

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents