Similar Projects
New Water Treatment System
Term Contract, Alteration
Design
$25,000 to $100,000 est. value
Waldport, OR

Water Filtration System
Renovation
Bidding
$600,000 CJ est. value
Woodburn, OR 97071

Water Filtration Plant Clearwell Baffling System
Infrastructure
Sub-Bidding
$350,000 CJ est. value
Pendleton, OR 97801

Plumbing Contractor of Record
Infrastructure
Sub-Bidding
$130,000 CJ est. value
Salem, OR 97301

FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Post-Bid
$2,500 to $300,000 est. value
Roseburg, OR 97471

CB2 at Brewery Blocks 2 Building
Alteration
Post-Bid
Portland, OR

Diamond Lake Rescue Building
New Construction, Alteration
Results
Roseburg, OR

Commercial Plumbing Service
Alteration
Results
OR

wastewater control system
Term Contract
Sub-Bidding
Albany, OR 97321

On-Call Trade Services for Prevailing Wage Projects
Term Contract
Post-Bid
OR

Philomath Water Treatment Plant Improvements, Phase I
Infrastructure
Results
$4,161,000 CJ est. value
Philomath, OR 97370

On-Call Repair and Maintenance Services Retainer Contract
Alteration
Post-Bid
Eugene, OR

Plumbing Supplies - EOCI
Term Contract
Post-Bid
Umatilla, OR 97882

Two Rivers Correctional Institution (TRCI) EVAC System Part Upgrade
Term Contract
Post-Bid
Umatilla, OR 97882

Plumbing Services
Term Contract
Post-Bid
Salem, OR 97301

Last Updated 04/17/2023 08:26 AM
Project Title

Tri-City Water Resource Recovery Facility ("WRRF") Fill Removal

Physical Address View project details and contacts
City, State (County) Oregon City, OR 97045   (Clackamas County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $662,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contact Information Procurement Process and Technical Questions: Tralee Whitley at TWhitley@clackamas.us . Scope of Work The work contemplated under this contract with the Owner, includes all labor, materials, transportation, equipment and services necessary for, and reasonably incidental to, the completion of all construction work in connection with the project described in the Project Manual which includes, but is not necessarily limited to, the Notice of Public Improvement Contract Opportunity, Instructions to Bidders, Supplemental Instructions to Bidders, Bid Form, Bid Bond, Public Improvement Contract Form, Performance Bond, Payment Bond, Clackamas County General Conditions for Public Improvement Contracts (10/13/2021), Supplemental General Conditions, and Plans, Specifications and Drawings. Engineers Estimate: $350,000.00 SUBSTANTIAL COMPLETION DATE: September 1, 2022 FINAL COMPLETION DATE: October 31, 2022 The material to be removed is clean fill material that was excavated and stockpiled during a construction project in 2008. Prior to soil disturbing activities, contractor to install erosion control precautions which need to be maintained through project completion. The area is currently vegetated and will require clearing and grubbing prior to fill removal. Fill in this area needs to be removed to the flood plain elevation of 48.00 using North American Vertical Datum of 1988 (NAVD).The site is on top of the old Rossman landfill. If municipal solid waste is encountered, Contractor to halt removal in that location and contact district. Disturbance of the cap is not permitted. All costs and delays will be contractor's responsibility. WES will work with contractor to install signage along the adjacent pedestrian trail to notify the public of the soil removal activities.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents