Similar Projects
Furnace and A/C units (2 Locations)
Renovation
Design
Lynnville, IN 47619

Connect Air Handling Unit to Emergency Electrical Power
Renovation
Bidding
$100,000 CJ est. value
Fort Wayne, IN 46805

HVAC Upgrades
Renovation
Sub-Bidding
$657,000 CJ est. value
Versailles, IN 47042

HVAC Renovations to the Lake Prairie Elementary School
Alteration
Post-Bid
$500,000 est. value
Lowell, IN 46356

HVAC Renovations at Cyber Crimes Unit-ISP Post 52
Alteration
Post-Bid
$150,000 est. value
Indianapolis, IN 46219

Mechanical Services Indianapolis Public Library
Term Contract
Results
Indianapolis, IN 46208

F103--Boiler and Cooling Tower Water Treatment Program
Term Contract
Results
Danville, IN 46122

Kingsford Heights Elementary HVAC and Controls Upgrades
Renovation
Construction
$400,000 CJ est. value
Kingsford Heights, IN 46346

Temperature Controls - Package 1
Alteration
Post-Bid
Indianapolis, IN 46220

Mechanical Systems Upgrade
Alteration
Results
$300,000 est. value
Muncie, IN

CEP - Air Compressor Upgrades at the Indianapolis International Airport
Renovation
Post-Bid
$60,000 CJ est. value
Indianapolis, IN 46241

IN073 Science Building-Replace AHU-1
Alteration
Results
Bloomington, Indianapolis, IN 46202

IPS Temperature Controls - Package 2
Alteration
Post-Bid
Indianapolis, IN 46204

Gym Air Handlers Replacement
Alteration
Results
Petersburg, IN 47567

Design - Terminal and Concourse HVAC System Upgrades
Alteration
Post-Bid
$100,000 est. value
Indianapolis, IN 46241

Last Updated 08/11/2023 12:32 PM
Project Title

Pruis Hall Air Handling Unit Replacement

Physical Address View project details and contacts
City, State (County) Muncie, IN 47303   (Delaware County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $788,600 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project has been Rebid. Ball State University is rejecting all bids Removal of Previously-abandoned steam piping and equipment, replacement of air handling unit, reconfiguration of pumps and associated piping. Bids shall be properly executed, addressed to Ball State University Board of Trustees, submitted on Contractors Bid For Public Works Form 96 (revised 2013), as prescribed by the Indiana State Board of Accounts giving financial data as recent as possible and in no event older than 90 days. Each Bid must be accompanied by the contractor's Minority, Women's, and Veteran Business Participation Plan, advising whether, and if so how the contractor will utilize Minority, Women's and Veteran owned enterprises as subcontractors or material suppliers on the project. Each bid shall be accompanied by a certified check or bank draft, made payable to the order of Alan Finn, Vice President for Business Affairs and Treasurer for Ball State University, Muncie, Indiana, or by an acceptable bidder's bond for an amount not less than 5 percent of the total bid price. All copies of the Bid, the bid security, and any other documents required to be submitted with the Bid shall be enclosed in a sealed opaque envelope marked SEALED BID. The envelope shall be addressed to Ball State University Board of Trustees and shall be identified with the Project name, the Bidder's name and address and, if the Bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope marked "SEALED BID ENCLOSED" on the face thereof. K. The contractor awarded work shall be required to furnish an acceptable surety bond in the full amount of the contract. The Contract shall be awarded in accordance with the provisions of IC 5-16-13. Pursuant to IC 5-16-13-7, the provisions of the law are incorporated by reference in each public works contract and Contractor agrees that pursuant to IC 5-16-13- 8 the public works project will not be structured other than in the contractor tier structure required by law. Contractor shall be required to comply in all respects with the provisions of IC 5-16-13 commencing with public works contracts, including but not limited to training programs, document preservation and availability of inspection and suspected worker misclassification procedures which commence with public works contracts. The provisions pursuant to IC 5- 16-13-10 (c), public works contracts commencing after December 30, 2016 include requirements for prequalification by the Indiana Department of Administration (IDOA). In accordance with IC 22-5-1.7-11.1, Contractors entering into a contract with the Owner will be required to enroll in and verify the work eligibility status of all newly hired employees through the E-Verify Program and execute an affidavit certifying compliance with the law in the form included in the Contract Documents. Ball State University reserves the right to reject any bids or all bids, to make any combination thereof, to waive any informality therein, and to return any unopened bids received after the time fixed herein. Bids received after the designated time for closing will be returned unopened. Bids may be withdrawn prior to the designated time, but no bids shall be withdrawn for a period of sixty (60) days thereafter.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents