Similar Projects
Farm & Field Glamping
New Construction - 3,072 SF
Conception
$500,000 to $1,000,000 CJ est. value
Chatham, NY 12037

Amazon Distribution Center
New Construction - 629,186 SF
Conception
$135,000,000 est. value
Hopewell Junction, NY 12533

Correia Storage Facility
New Construction - 12,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Yorktown, NY 10598

Extra Space Storage
New Construction - 130,000 SF
Design
$25,000,000 est. value
New Rochelle, NY 10801

Vails Gate FD - New Storage Building (Phase I)
New Construction
Bidding
New Windsor, NY 12553

35 Erie Boulevard - Buildings 01, 02 and 03
New Construction, Renovation
Bidding
Menands, NY 12204

USACE Buffalo District Buildings Renovations
Renovation - 20,000 SF
Post-Bid
Buffalo, NY 14207

Extra Space Storage Facility
New Construction, Demolition - 141,000 SF
Post-Bid
$26,500,000 est. value
New Rochelle, NY 10805

Town of North East New Highway Department Storage Building Construction
Results
Millerton, NY 12546

Construction of Pre-Engineered Metal Storage Building
Results
Clarksville, NY 12186

Port of Albany Maritime Warehouse and Related Maritime Terminal Improvements
New Construction, Demolition - 60,000 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Albany, NY 12202

President Container Storage
Addition - 98,500 SF
Construction
$7,309,746 est. value
Middletown, NY 10941

Sonwil Distribution Center - Warehouse 2
New Construction - 335,868 SF
Pending Verification
$52,300,000 est. value
Buffalo, NY 14220

Wildflower Studios
New Construction
Pending Verification
Astoria, NY

Herring Contractor's Storage Building
New Construction - 20,000 SF
Design
Fishkill, NY 12524

Last Updated 12/10/2021 08:07 AM
Project Title

Construct SOEK Storage Facility - Construction

Physical Address View project details and contacts
City, State (County) Comstock, NY 12821   (Washington County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method
Project Status Construction Commenced December 2021, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Work, HVAC Work, Plumbing Work, and Electrical Work, Construct SOEK Storage Facility, Washington Correctional Annex Building, 72 Lock Eleven Lane, Comstock (Washington County), NY SDVOB Goal: 6%

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents