Similar Projects
Newburgh Road Water Transmission Main - 122007 - Great Lakes Water Authority
Infrastructure
Conception
$5,239,000 CJ est. value
Livonia, MI 48154

Construction Engineering Services for Eureka Road (Toledo Road to Ford/M-85)
Infrastructure
Conception
$1,000,000 CJ est. value
Taylor, MI 48180

Panda Express / Canton
New Construction, Infrastructure
Design
$700,000 CJ est. value
Canton, MI 48188

Sidewalk Replacement Program Phase 1
Infrastructure
Design
$200,000 CJ est. value
Inkster, MI 48141

Senior Center Parking Lot Replacement
Infrastructure
Post-Bid
$176,520 CJ est. value
Rockwood, MI 48173

Vernon Dix Plaza Development
Infrastructure
Post-Bid
$40,000 CJ est. value
Dearborn, MI 48126

Taylor High Running Track
New Construction
Results
Taylor, MI 48180

Building Addition at Kinloch Elementary School
Addition, Demolition, Infrastructure, Renovation
Results
$2,575,000 CJ est. value
Dearborn Heights, MI 48127

The Perennial Corktown
New Construction, Infrastructure - 2,236 SF
Construction
$78,200,000 CJ est. value
Detroit, MI 48216

Eastland Center Redevelopment / Vernier Road Industrial Complex
Demolition, New Construction, Infrastructure - 514,000 SF
Construction
$94,200,000 CJ est. value
Harper Woods, MI 48225

University of Michigan Center for Innovation
New Construction, Infrastructure - 190,000 SF
Pending Verification
$250,000,000 CJ est. value
Detroit, MI 48204

Chipotle / Canton
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Canton, MI 48188

Tireman Road and Greenfield Road - 30-420 - Dearborn
Infrastructure
Conception
$500,000 CJ est. value
Dearborn, MI 48126

RUSD 2022 Bond Projects - Future Phases
Renovation
Design
$34,500,000 est. value
MI

North Service Center Pumping Station Improvements - Great Lakes Water Authority
Demolition, Renovation, Infrastructure
Post-Bid
$72,216,000 CJ est. value
West Bloomfield, MI 48323

Last Updated 10/04/2023 11:00 AM
Project Title

Baseball/Softball Field Bleachers at Carlson High School

Physical Address View project details and contacts
City, State (County) Gibraltar, MI 48173   (Wayne County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $315,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Gibraltar School District will accept sealed bids for the replacement of the baseball/softball field bleachers at Carlson High School located at 30500 West Jefferson, Gibraltar, MI 48173. Work is requested to be completed as soon as possible but no later than March 1, 2024. Project Overview: Scope of Work: The project involves the removal and replacement of existing baseball and softball bleachers. The new bleachers must comply with all relevant safety codes and regulations, including those set by the American with Disabilities Act (ADA), and be designed to accommodate our athletes, spectators, and officials effectively. (4) 15 feet long 5 row aluminum bleachers with royal blue riser planks. (2) Approximately 27-30 feet long 5 row aluminum bleachers with royal blue riser planks. (2) Approximately 25-28 feet long aluminum bench with backrest and shelf for softball dugouts. Bleacher Specifications: Please provide detailed specifications of the bleachers you propose, including seating capacity, materials, finishes, anchoring methods, and any additional features or amenities (e.g., accessible seating, shade structures, team seating, etc.). Project Timeline: We anticipate that the project will commence ASAP and must be completed no later than March 1, 2024. Proposals should include a project schedule outlining key milestones, including delivery and installation. Cost Estimate: Submit a comprehensive cost estimate, which should include the cost of materials, labor, equipment, permits, and any other related expenses. Provide a detailed breakdown of costs for our evaluation. Warranty: Detail the warranty provided for the new bleachers, including the coverage period and terms and conditions. Insurance and Licensing: Ensure that your company is appropriately licensed and insured to carry out the work. Provide proof of insurance coverage along with your proposal. References: Include references from previous clients for similar projects. We may contact these references to assess your company's performance and reputation. Submission Guidelines: Proposals will be evaluated based on several criteria, including cost, experience, references, and compliance with project specifications. Any questions or requests for clarification should be directed to Greg Timmons at Timmong@gibdist.net or 734-379-6377.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents