Similar Projects
Misc. Electrical and Lighting
Bidding
Brighton, Denver, CO 80216

Bhs Stadium Lighting Contractor Services
Post-Bid
Brighton, CO 80601

Recapitalization of Utilities Load Centers & UPS EE-FF-GG
Post-Bid
$10,000,000 to $25,000,000 est. value
Aurora, CO 80017

Playground Lights
Results
$150,000 to $200,000 est. value
Brighton, CO 80601

Electrician Services
Term Contract
Results
Thornton, CO

Generators
Post-Bid
Aurora, CO 80011

Zone 3 Booster Pump Station Electrical Upgrades Project, Phase 2
Results
Aurora, CO

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

SB267 Repairs/ Upgrades to Mechanical and Electrical Systems-Three Troop Offices / Adams
Results
$158,200 est. value
Commerce City, CO 80022

Audio, Staging and Lighting Services as Required for Aurora 2020 Signature Events
Term Contract
Post-Bid
Aurora, CO 80012

UPS Battery Removal and Replacement
Term Contract
Results
Northglenn, CO 80241

300kva Three-Phase Pad-Mounted Transformer
Post-Bid
Aurora, CO 80045

I-76 Luminaire Rewiring Project
Term Contract
Results
$400,000 to $500,000 est. value
Brighton, CO 80601

CU Denver Building Add Domestic Water Pump
Post-Bid
$250,000 to $300,000 est. value
Aurora, CO 80045

On-Call Emergency Generator/Transfer Switch Maintenance and Rental
Results
Brighton, CO 80601

Reported 03/13/2020 12:00 AM
Project Title

Recapitalization of Utilities (Recap 3)

Physical Address View project details and contacts
City, State (County) Aurora, CO   (Adams County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $250,000,000 to $500,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: Construction of a holistic solution to recapitalize the existing medium voltage power generation and distribution system serving the Mission Support Group, Facilities, Logistics & Services Division (MSG/FLSD) located on Buckley Air Force Base, CO. This includes expanding the Power Plant to provide the generation capacity necessary to meet the future load requirements of the installation and demolishing the existing central power plant that is approaching the end of its useful life. The project will include the replacement of the existing medium voltage electrical power distribution systems, which serves four buildings, from the existing central power plant. This will be executed via new underground duct banks. Additionally, a SCADA controls system capable of controlling all power generation and distribution systems will be developed and will serve as the backbone for the future Facility Infrastructure Control System (FICS). This project is known as Recap 3.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents