Similar Projects
Hayes Elementary School Construction
New Construction
Conception
Ada, OK

Utilities
Infrastructure
Conception
$81,370,000 est. value
Ada, OK 74821

Washington School Replacement - 2021 Bond - Ada City School District
New Construction
Design
$37,000,000 est. value
Ada, OK

Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Widen, Resurface, and Bridge
Infrastructure
Bidding
$11,670,289 CJ est. value
Ada, OK 74820

2022 CDBG-CR Community Center
New Construction, Infrastructure
Bidding
$272,500 CJ est. value
Francis, OK 74844

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Waterline Relocation
Infrastructure
Results
$50,000 to $54,000 est. value
OK

Water System Improvements Water Meter Project
Infrastructure
Results
$400,000 est. value
Fittstown, OK

Hayes School Replacement - 2021 Bond - Ada City School District
New Construction, Infrastructure
Pending Verification
$37,000,000 CJ est. value
Ada, OK 74820

Hayes School Replacement - 2021 Bond - Ada City School District
New Construction, Infrastructure
Pending Verification
$37,000,000 CJ est. value
Ada, OK 74820

Pavement Rehabilitation - SH 1
Infrastructure
Design
$1,500,000 CJ est. value
Ada, OK 74820

Overlay Road Project for Three (3) Miles on Thomas Ranch Road (Pontotoc County District #1
Infrastructure
Post-Bid
$850,000 CJ est. value
Ada, OK 74820

Water Line Improvements
Infrastructure
Results
$1,453,390 CJ est. value
Francis, OK 74844

Last Updated 01/05/2023 05:12 PM
Project Title

New 1st- 2nd Grade Center - Early Dirt Package

Physical Address View project details and contacts
City, State (County) Ada, OK 74820   (Pontotoc County)
Category(s) Education, Heavy and Highway, Sewer and Water
Sub-Category(s) Elementary School, Site Development, Water Lines
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is being bid in bid packages and shall be constructed in accordance with the Drawings and Specifications prepared by Redland Childers Architects and shall consist of furnishing all materials, supplies, equipment, tools, services, labor and incidental work as required to construct the project described in general as follows: Early Site Package for a future 78,000sf elementary school. Current packages include site grading, building pad, storm drainage, watermain extension, and sewer relocation. Bid Packages include: #2A: Site Work and Site Demo #2B: Site Utilities and Site Utility Demo Pre-Bid Conference - There will not be a pre bid conference. Questions should be directed to: Michael Barnes, Construction Manager 19080 CR 1590 Ada, Oklahoma 74820 Phone: (580) 332-1404 All bids over $50,000 must be accompanied by a certified check, cashier's check, or bid bond, payable without reserve, to the owner and Construction Manager as dual obligees in an amount not less than five percent (5%) of the total amount of the Bid. This security is given as a guarantee that the Bidder will enter into a Contract with the Construction Manager for the construction of this project, furnish satisfactory labor and materials, maintenance and performance bonds and insurance certificates within ten (10) days after notice of award, and in the event of failure to do so, shall pay to the Owner the sum of five percent (5%) of said bid as liquidated damages. No Bidder may withdraw his bid for a period of thirty (30) days after the bid opening date. Bids received more than ninety-six (96) hours before the time set for receiving bids as well as bids received after the time set for receipt of bids will not be considered and will be returned unopened. The Owner reserves the right to reject any or all bids and to waive formalities or minor irregularities in any bid, and to determine and select the lowest and best bid. The amount of the deposit for drawings and specifications will be returned to each actual Bidder who returns the drawings and specifications UNMARKED, complete with all Addenda, and in good condition within ten (10) days after opening of bids.

Details

78,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents