Similar Projects
Water Main Replacement
Bidding
Elmwood Park, IL

Valve Actuator Replacement
Bidding
Oak Park, IL

Term Agreement for Water Main Construction - District Two
Term Contract
Post-Bid
Chicago, IL

Catch Basin and Inlet Cleaning 2020-2021
Term Contract
Post-Bid
Mount Prospect, IL 60056

Frontage Road Water Main Lining Improvements
Renovation
Results
Northfield, IL 60093

Manhole Cleaning
Results
Palos Park, IL 60464

Water Main Improvements
Bidding
Tinley Park, IL

Water Distribution System Leak Survey
Post-Bid
Oak Park, IL

2020 Manhole Rehabilitation
Results
$337,726 to $359,476 est. value
Elk Grove Village, IL 60007

Water Main Improvements Various Locations
Renovation
Bidding
$1,000,000 est. value
Alsip, IL

Water Supply Leak Detection Survey
Post-Bid
Park Ridge, IL 60068

2020 Sanitary Sewer Inspection and Rehabilitation
Results
Oak Lawn, IL 60453

Watermain Valve Insertion
Infrastructure
Bidding
Park Ridge, IL

Basement Water Main Pipe
Renovation
Post-Bid
Park Forest, IL 60466

Term Agreement for Water Main Construction - District Three
Term Contract
Results
Chicago, IL

Reported 06/03/2021 12:00 AM
Project Title

Revise Domestic Water System - SRH

Physical Address View project details and contacts
City, State (County) Chicago, IL 60612   (Cook County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

There is a 30 percent BEP goal The hot and cold water gravity feed tanks in the penthouse will be removed in entirety, and the domestic hot water heaters and system booster pumps in the basement will be replaced with new equipment. There are three clusters of dorm-style showers on each typical floor (4-8). This project will demolish the shower liners, domestic water connections, sanitary and vent services, and mechanical exhaust back to the riser mains and physically enclose the space. Additionally, there are some ancillary considerations, including terminating unused laundry room plumbing and mechanical services, and University-performed enabling work prior to construction.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents